{"title":"THE EFFECT OF TEMPERATURE AND WATER CONDUCTIVITY IN HOT BASIN TOWARD EFFECTIVENESS OF COOLING TOWER ON UTILITY UNIT PT. X","authors":"Indah Dhamayanthie, Y. Mulyani","doi":"10.33603/jgst.v7i1.11","DOIUrl":null,"url":null,"abstract":"PT X is one of the Reviews largest ethanol producing plant in Indonesia, PT X located ± 15 km the northeast of Solo or 110 Km to the south of Central Java, SeAprilang. Cooling Tower is a tower or building of water circulation directly or indirectly contact with hot water and then converted into cold water expected that a number of heat from a fluid to another fluid. The Cooling Tower operates According to the diffusion principle, where temperature changes can result in a difference in the rate of temperature displacement. From the process in the cooling tower unit there are Several variables contained in the cooling towers ranging from the temperature and water conductivity in the hot basin. Obtained from the variables can be used to analyze the effectiveness of the cooling tower unit. When the conductivity contained in the water in the basin of hot high then the effectiveness of cooling tower will Decrease, likewise vice versa. And the value of effectiveness Obtained range of 76.12% - 87.80%. Where the company's standard value is 75% effectiveness. There are Several factors Determining the high value of conductivity values such as chemical mixing, high temperature in the cooling tower, and the temperature around the cooling tower.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v7i1.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT X is one of the Reviews largest ethanol producing plant in Indonesia, PT X located ± 15 km the northeast of Solo or 110 Km to the south of Central Java, SeAprilang. Cooling Tower is a tower or building of water circulation directly or indirectly contact with hot water and then converted into cold water expected that a number of heat from a fluid to another fluid. The Cooling Tower operates According to the diffusion principle, where temperature changes can result in a difference in the rate of temperature displacement. From the process in the cooling tower unit there are Several variables contained in the cooling towers ranging from the temperature and water conductivity in the hot basin. Obtained from the variables can be used to analyze the effectiveness of the cooling tower unit. When the conductivity contained in the water in the basin of hot high then the effectiveness of cooling tower will Decrease, likewise vice versa. And the value of effectiveness Obtained range of 76.12% - 87.80%. Where the company's standard value is 75% effectiveness. There are Several factors Determining the high value of conductivity values such as chemical mixing, high temperature in the cooling tower, and the temperature around the cooling tower.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
某电厂热盆温度和水传导性对冷却塔效能的影响
PT X是review在印尼最大的乙醇生产厂之一,PT X位于梭罗东北方向15公里处或SeAprilang中爪哇以南110公里处。冷却塔是水循环塔或建筑物与热水直接或间接接触,然后预期将若干热量从一种流体转化为冷水,传递给另一种流体。冷却塔根据扩散原理运行,温度变化会导致温度位移速率的差异。从冷却塔单元的过程来看,冷却塔中包含几个变量,从温度到热盆中的水电导率。由此得到的变量可用于分析冷却塔机组的有效性。当盆内热水的导电性高时,冷却塔的效率会降低,反之亦然。得到的有效性值范围为76.12% ~ 87.80%。公司的标准值是75%的有效性。化学混合、冷却塔内高温、冷却塔周围温度等因素决定了电导率值的高值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1