An extended reliability growth model for managing and assessing corrective actions

L. H. Crow
{"title":"An extended reliability growth model for managing and assessing corrective actions","authors":"L. H. Crow","doi":"10.1109/RAMS.2004.1285426","DOIUrl":null,"url":null,"abstract":"The most widely used traditional reliability growth tracking model and reliability growth projection model are both included as IEC International Standard and US ANSI National Standard models. These traditional models address reliability growth based on failure modes surfaced during the test. With the tracking model all corrective actions are incorporated during test, called test-fix-test. With the projection model all corrective actions are delayed until the end of test. This is called test-find-test. However, the most common approach for development-testing programs include some corrective actions during testing and some delayed fixes incorporated at the end of test. That is, test-fix-find-test. This paper presents an extended model that addresses this practical situation and allows for preemptive corrective actions.","PeriodicalId":270494,"journal":{"name":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"63","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2004.1285426","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 63

Abstract

The most widely used traditional reliability growth tracking model and reliability growth projection model are both included as IEC International Standard and US ANSI National Standard models. These traditional models address reliability growth based on failure modes surfaced during the test. With the tracking model all corrective actions are incorporated during test, called test-fix-test. With the projection model all corrective actions are delayed until the end of test. This is called test-find-test. However, the most common approach for development-testing programs include some corrective actions during testing and some delayed fixes incorporated at the end of test. That is, test-fix-find-test. This paper presents an extended model that addresses this practical situation and allows for preemptive corrective actions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用于管理和评估纠正措施的扩展可靠性增长模型
目前应用最广泛的传统可靠性增长跟踪模型和可靠性增长预测模型都是IEC国际标准和美国ANSI国家标准模型。这些传统模型基于试验过程中出现的失效模式来解决可靠性增长问题。在跟踪模型中,所有的纠正动作在测试期间被合并,称为test-fix-test。在投影模型中,所有的纠正动作都延迟到测试结束。这被称为测试-发现-测试。然而,开发测试程序的最常见方法包括在测试期间的一些纠正操作和在测试结束时合并的一些延迟修复。即,测试-修复-查找-测试。本文提出了一个扩展模型,解决了这种实际情况,并允许先发制人的纠正行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Forecasting models for maintenance work load with seasonal components An extended reliability growth model for managing and assessing corrective actions An accelerated life testing model involving performance degradation Lessons learned from development and implementation of a strategic life cycle model Criticality evaluation for spare parts initial provisioning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1