Zachary J. Oliphant, J. W. Curtis, Ben Jessup, C. Schnetzler
{"title":"Keeping the Project on Schedule—A Case Study about Emergency Weld Repairs Required on a Newly Installed Vibratory Caisson","authors":"Zachary J. Oliphant, J. W. Curtis, Ben Jessup, C. Schnetzler","doi":"10.1061/9780784481837.002","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Transmission and Substation Structures 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784481837.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}