Kajian Teknis dan Ekonomis Kegiatan Reklamasi Tambang Andesit di PT. Gunung Bale Desa Argotirto, Kecamatan Sumber Manjing Wetan, Kabupaten Malang, Provinsi Jawa Timur

Bryan Sapta Etdria, Sri Widayati, Indra Karna Wijaksana
{"title":"Kajian Teknis dan Ekonomis Kegiatan Reklamasi Tambang Andesit di PT. Gunung Bale Desa Argotirto, Kecamatan Sumber Manjing Wetan, Kabupaten Malang, Provinsi Jawa Timur","authors":"Bryan Sapta Etdria, Sri Widayati, Indra Karna Wijaksana","doi":"10.29313/bcsme.v2i1.2343","DOIUrl":null,"url":null,"abstract":"Abstract. Mining activities are activities that change the shape of the earth's surface, including andesite mining in Argotirto Village. One of the companies that carry out andesite mining in Sumber Manjing Wetan District is the research location area. Mining activities carried out by the company are using the open pit mining method. This mining causes changes in the shape of the land that are very clear. As mining progresses, it is necessary to make efforts to improve land through reclamation activities.This research was conducted to determine the technical plan for land management, revegetation, maintenance and reclamation costs, as well as to determine the area to be reclaimed. The plan and stages of reclamation activities during the first period are carried out from 2020-2025 with the reclamation area in accordance with the mine opening area. The total area to be reclaimed in the first period is 2.8 hectares.Based on the research results of PT. Gunung Bale is planning reclamation activities in the 1st year to conduct reclamation in block A 1 covering an area of ​​0.4 Ha. In the second year, reclamation is carried out on block A2 with an area of ​​0.6 Ha. In the 3rd year, reclamation was carried out on block A3 covering an area of ​​0.6 Ha. In the 4th year, reclamation was carried out on block A4 covering an area of ​​0.6 Ha. In the 5th year, reclamation was carried out on block A5 covering an area of ​​0.6 Ha. The cost of the reclamation plan required during the first period is Rp. 202.137.609,- \nAbstrak. Kegiatan penambangan merupakan kegiatan yang merubah suatu bentuk rona muka bumi tidak terkecuali penambangan andesit di Desa Argotirto. Salah satu perusahaan yang melakukan penambangan andesit di Kecamatan  Sumber Manjing Wetan adalah area lokasi penelitian. Kegiatan penambangan yang dilakukan oleh perusahaan adalah dengan metode tambang terbuka. Penambangan ini menyebabkan terjadinya perubahan pada bentuk lahan yang sangat jelas. Seiring berjalannya penambangan perlu dilakukan upaya perbaikan lahan melalui kegiatan reklamasi. Penelitian ini dilakukan untuk mengetahui rencana teknis penataan lahan, revegetasi, pemeliharaan dan biaya reklamasi, serta mengetahui luasan yang akan direklamasi. Rencana dan tahapan kegiatan reklamasi selama periode pertama dilakukan dari tahun 2020-2025 dengan luas area reklamasi sesuai dengan area bukaan tambang. Luas total yang akan direklamasi pada periode pertama yaitu seluas 2,8 Ha.Berdasarkan hasil penelitian PT. Gunung Bale merencanakan kegiatan reklamasi pada tahun ke – 1 dilakukan reklamasi pada blok A 1 seluas 0,4 Ha. Pada tahun ke – 2 dilakukan reklamasi pada blok A2 seluas 0,6 Ha. Pada tahun ke – 3 dilakukan reklamasi pada blok A3 seluas 0,6 Ha. Pada tahun ke – 4 dilakukan reklamasi pada blok A4 seluas 0,6 Ha. Pada tahun ke – 5 dilakukan reklamasi pada blok A5 seluas 0,6 Ha. Biaya rencana reklamasi yang dibutuhkan selama periode pertama yaitu sebesar Rp 202.137.609,-","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v2i1.2343","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. Mining activities are activities that change the shape of the earth's surface, including andesite mining in Argotirto Village. One of the companies that carry out andesite mining in Sumber Manjing Wetan District is the research location area. Mining activities carried out by the company are using the open pit mining method. This mining causes changes in the shape of the land that are very clear. As mining progresses, it is necessary to make efforts to improve land through reclamation activities.This research was conducted to determine the technical plan for land management, revegetation, maintenance and reclamation costs, as well as to determine the area to be reclaimed. The plan and stages of reclamation activities during the first period are carried out from 2020-2025 with the reclamation area in accordance with the mine opening area. The total area to be reclaimed in the first period is 2.8 hectares.Based on the research results of PT. Gunung Bale is planning reclamation activities in the 1st year to conduct reclamation in block A 1 covering an area of ​​0.4 Ha. In the second year, reclamation is carried out on block A2 with an area of ​​0.6 Ha. In the 3rd year, reclamation was carried out on block A3 covering an area of ​​0.6 Ha. In the 4th year, reclamation was carried out on block A4 covering an area of ​​0.6 Ha. In the 5th year, reclamation was carried out on block A5 covering an area of ​​0.6 Ha. The cost of the reclamation plan required during the first period is Rp. 202.137.609,- Abstrak. Kegiatan penambangan merupakan kegiatan yang merubah suatu bentuk rona muka bumi tidak terkecuali penambangan andesit di Desa Argotirto. Salah satu perusahaan yang melakukan penambangan andesit di Kecamatan  Sumber Manjing Wetan adalah area lokasi penelitian. Kegiatan penambangan yang dilakukan oleh perusahaan adalah dengan metode tambang terbuka. Penambangan ini menyebabkan terjadinya perubahan pada bentuk lahan yang sangat jelas. Seiring berjalannya penambangan perlu dilakukan upaya perbaikan lahan melalui kegiatan reklamasi. Penelitian ini dilakukan untuk mengetahui rencana teknis penataan lahan, revegetasi, pemeliharaan dan biaya reklamasi, serta mengetahui luasan yang akan direklamasi. Rencana dan tahapan kegiatan reklamasi selama periode pertama dilakukan dari tahun 2020-2025 dengan luas area reklamasi sesuai dengan area bukaan tambang. Luas total yang akan direklamasi pada periode pertama yaitu seluas 2,8 Ha.Berdasarkan hasil penelitian PT. Gunung Bale merencanakan kegiatan reklamasi pada tahun ke – 1 dilakukan reklamasi pada blok A 1 seluas 0,4 Ha. Pada tahun ke – 2 dilakukan reklamasi pada blok A2 seluas 0,6 Ha. Pada tahun ke – 3 dilakukan reklamasi pada blok A3 seluas 0,6 Ha. Pada tahun ke – 4 dilakukan reklamasi pada blok A4 seluas 0,6 Ha. Pada tahun ke – 5 dilakukan reklamasi pada blok A5 seluas 0,6 Ha. Biaya rencana reklamasi yang dibutuhkan selama periode pertama yaitu sebesar Rp 202.137.609,-
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
摘要。采矿活动是改变地球表面形状的活动,包括在argottto村的安山岩开采。该研究定位区是江苏荆渭滩地区开展安山岩开采的公司之一。本公司所进行的采矿活动均采用露天采矿法。这种开采导致了陆地形状的变化,这是非常明显的。随着矿业的发展,有必要通过填海活动努力改善土地。本研究旨在确定土地管理、植被恢复、维护和复垦成本的技术方案,并确定复垦面积。第一期复垦计划和阶段从2020年到2025年,复垦面积与矿山开放面积一致。第一期填海总面积为2.8公顷。根据PT的研究成果,Gunung Bale计划在第一年进行填海活动,在a1区块进行填海,面积为0.4 Ha。第二年,在A2地块进行填海,面积为0.6公顷。第三年,在A3地块进行填海,面积0.6公顷。第四年,在A4地块进行填海,面积为0.6公顷。第五年,在A5区块进行填海,面积为0.6公顷。第一期填海计划所需费用为202.137.609卢比,-摘要。Kegiatan penambangan merupakan Kegiatan yang merubah suatu bentuk是什么意思:我的意思是说,我的意思是说,我的意思是说,我的意思是说,我的意思是说,我的意思是说,我的意思是我的意思。Salah satu perusahaan yang melakukan penambangan and desit di Kecamatan Sumber Manjing Wetan adalah area lokasi penelitian。Kegiatan penambangan yang dilakukan oleh perusahaan adalah dengan方法tambang terbuka。Penambangan ini menyebabkan terjadinya perubahan pada bentuk lahan yang sangat jelas。如果你想要一个更好的生活,那就去做一个更好的生活。Penelitian ini dilakukan untuk mengetahui rencana teknis penataan lahan, revgetasi, pemeliharaan dan biaya reklamasi, serta mengetahui luasan yang akan direklamasi。Rencana dan tahapan kegiatan reklamasi selama期pertama dilakukan dari tahun 2020-2025年登干地区reklamasi sesuai登干地区bukaan tambang。芦山总阳川为2,8 Ha,是第三纪雅图剖面。Berdasarkan hasil penelitian PT. Gunung Bale merencanakan kegiatan reklamasi pada tahun ke - 1 dilakukan reklamasi pada block a1 sela为0,4 Ha。Pada tahun ke - 2 dilakukan reklamasi Pada区块A2面积为0,6 Ha。Pada tahun ke - 3 dilakukan reklamasi Pada区块A3面积为0,6 Ha。Pada tahun ke - 4 dilakukan reklamasi Pada区块A4面积为0,6 Ha。Pada tahun ke - 5 dilakukan reklamasi Pada block A5的面积为0,6 Ha。Biaya rencana reklamasi yang dibutuhkan selama perioma perama yitu sebesar [p] 202.137.609,-
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Kajian Kelayakan Ekonomi pada Kegiatan Hauling Tambang Tanah Liat PT Indocement Tunggal Prakarsa TBK Blok Pabuaran di Kecamatan Sukamakmur Kabupaten Bogor Provinsi Jawa Barat Analisis Investasi dan Kelayakan Ekonomi pada Penambangan Sirtu CV Billiant Ningrat di Kecamatan Leles Kabupaten Garut Provinsi Jawa Barat Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU Monitoring Korosi Discharge Conveyor F pada Tambang Batubara PT XYZ di Kabupaten Merangin Provinsi Jambi Pengaruh Bidang Diskontinu Terhadap Potensi Longsoran Baji pada Lereng Tambang Terbuka di PT Indocement Tunggal Prakarsa Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1