Jeonje Park, Wu Liang, Jaeseok Choi, A. El-Keib, Mohammad Shahidehpour
{"title":"Transmission system expansion planning by nodal delivery marginal rate criterion","authors":"Jeonje Park, Wu Liang, Jaeseok Choi, A. El-Keib, Mohammad Shahidehpour","doi":"10.1109/TD-ASIA.2009.5356816","DOIUrl":null,"url":null,"abstract":"This paper proposes a method for choosing the best transmission system expansion plan(TSEP) using nodal/bus delivery marginal rate criterion (BMRk) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the BMRk which means a nodal deterministic reliability level requirement at specified load point. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the TSEPproblem in competitive electricity market environment.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356816","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper proposes a method for choosing the best transmission system expansion plan(TSEP) using nodal/bus delivery marginal rate criterion (BMRk) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the BMRk which means a nodal deterministic reliability level requirement at specified load point. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the TSEPproblem in competitive electricity market environment.