Jin-Won Kim, Gun-hee Cho, Sanghoon Song, Jong-Dae Bang, J. Sohn
{"title":"Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation","authors":"Jin-Won Kim, Gun-hee Cho, Sanghoon Song, Jong-Dae Bang, J. Sohn","doi":"10.5804/LHIJ.2016.7.4.315","DOIUrl":null,"url":null,"abstract":"Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of OO corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.","PeriodicalId":365439,"journal":{"name":"LHI journal of land, housing, and urban affairs","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"LHI journal of land, housing, and urban affairs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5804/LHIJ.2016.7.4.315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of OO corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.