Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation

Jin-Won Kim, Gun-hee Cho, Sanghoon Song, Jong-Dae Bang, J. Sohn
{"title":"Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation","authors":"Jin-Won Kim, Gun-hee Cho, Sanghoon Song, Jong-Dae Bang, J. Sohn","doi":"10.5804/LHIJ.2016.7.4.315","DOIUrl":null,"url":null,"abstract":"Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of OO corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.","PeriodicalId":365439,"journal":{"name":"LHI journal of land, housing, and urban affairs","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"LHI journal of land, housing, and urban affairs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5804/LHIJ.2016.7.4.315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Recently, Ministry of Land, Infrastructure and Transport has amended the law to Design for Safety in working design stage of construction work. There should be informed the disaster likelihood and severity of unit-works to decide risk of unit-works in Design for Safety. Therefore, the construction disaster data of OO corporation were classified as 24 unit-works and the disaster likelihood and severity of unit works were analyzed in this study. The safety management level of unit-works which based on analysis data was suggested 3 groups; special management and emphasis management, regular management. The results of this study can be used as basic information to perform Design for Safety in construction. And this information will be able to reduce the disaster.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
施工安全设计的单位分析——以OO公司施工项目为例
最近,国土交通部修改了《建筑工程施工设计阶段安全设计法》。在安全设计中,应了解机组发生灾害的可能性和严重程度,以确定机组的风险。因此,本研究将OO公司的施工灾害数据分类为24个单体工程,并对单体工程的灾害可能性和严重程度进行分析。根据分析数据,提出了机组安全管理水平分为3组;专项管理、重点管理、常态化管理。研究结果可作为施工安全设计的基础资料。这些信息将能够减少灾难。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Economic Self-Sufficiency Criteria for New Town Planning by Network Characteristics Analytical Study on the Pullout Resistance Characteristics of Bored Pile Analysis of Unit-works for Design for Safety in Construction Work : Focus on Construction Projects of OO Corporation An Analysis of Energy Reduction Effects in Housing According to Green Roof Urban Economic Regeneration Strategies of Local Initiative through the Analysis of Regional Strategic Industry Policy Cases
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1