The economics of computer-based training

D. Barnes
{"title":"The economics of computer-based training","authors":"D. Barnes","doi":"10.1109/HFPP.1992.283371","DOIUrl":null,"url":null,"abstract":"A new training technology called computer-based training (CBT), or interactive videodisc (IVD) has been used during the last decade. Many industries have made limited or no use of the technology because of lack of information about the costs involved in a CBT/IVD program. At a nuclear weapons facility operated by the Department of Energy, CBT/IVD has been utilized for nine years. Although it has appeared to be cost-effective, studies have been conducted to document this fact and to predict the cost-effectiveness of a program before it is developed. The author attempts to show the real costs of CBT as well as when it is most cost-effective as a training tool.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283371","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A new training technology called computer-based training (CBT), or interactive videodisc (IVD) has been used during the last decade. Many industries have made limited or no use of the technology because of lack of information about the costs involved in a CBT/IVD program. At a nuclear weapons facility operated by the Department of Energy, CBT/IVD has been utilized for nine years. Although it has appeared to be cost-effective, studies have been conducted to document this fact and to predict the cost-effectiveness of a program before it is developed. The author attempts to show the real costs of CBT as well as when it is most cost-effective as a training tool.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计算机培训的经济学
在过去的十年中,一种新的培训技术被称为计算机培训(CBT)或交互式视频光盘(IVD)。由于缺乏有关CBT/IVD项目成本的信息,许多行业对该技术的使用有限或根本没有使用。在美国能源部运营的核武器设施中,CBT/IVD已经使用了9年。虽然它似乎具有成本效益,但已经进行了研究来记录这一事实,并在制定计划之前预测其成本效益。作者试图展示CBT的实际成本,以及什么时候它作为一种培训工具最具成本效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
When technicians use computer programs: approaches to procedure writing The evaluation of crew factors in aircrew team performance Performance of nuclear power plant or automated system depends on operator's availability Getting the attention of senior management for human factors issues: quantitative survey data Progress of I&C system and control room design in TEPCO nuclear power plants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1