{"title":"A risk-driven method for eXtreme programming release planning","authors":"Mingshu Li, Meng-Cheng Huang, Fengdi Shu, Juan Li","doi":"10.1145/1134285.1134344","DOIUrl":null,"url":null,"abstract":"XP (eXtreme Programming) has become popular for IID (Iteration and Increment Development). It is suitable for small teams, lightweight projects and vague/volatile requirements. However, some challenges are left to developers when they desire to practise XP. A critical one of them is constructing the release plan and negotiating it with customers. In this paper, we propose a risk-driven method for XP release planning. It has been applied in a case study and the results show the method is feasible and effective. XP practicers can follow it to decide a suitable release plan and control the development process.","PeriodicalId":246572,"journal":{"name":"Proceedings of the 28th international conference on Software engineering","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"30","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 28th international conference on Software engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1134285.1134344","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 30
Abstract
XP (eXtreme Programming) has become popular for IID (Iteration and Increment Development). It is suitable for small teams, lightweight projects and vague/volatile requirements. However, some challenges are left to developers when they desire to practise XP. A critical one of them is constructing the release plan and negotiating it with customers. In this paper, we propose a risk-driven method for XP release planning. It has been applied in a case study and the results show the method is feasible and effective. XP practicers can follow it to decide a suitable release plan and control the development process.