{"title":"Enterprise-Wide Workflow Management","authors":"C. Bussler","doi":"10.1109/4434.788777","DOIUrl":null,"url":null,"abstract":"Establishing transparent workflow distribution across heterogeneous workflow-management systems is very difficult, if not impossible, to achieve. The author expands on this in a case study and suggests various approaches. The process for building a Boeing 747 serves as the case study.","PeriodicalId":282630,"journal":{"name":"IEEE Concurr.","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"55","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Concurr.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/4434.788777","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 55
Abstract
Establishing transparent workflow distribution across heterogeneous workflow-management systems is very difficult, if not impossible, to achieve. The author expands on this in a case study and suggests various approaches. The process for building a Boeing 747 serves as the case study.