A Study on Using Large-Scale Energy Storage Systems in Automatic Generation Control Operations of the Energy Management Systems

Ji-Hoon Im, Gun-Pyo Lim, Chan-Wook Park, Yohan Choi, Seung-Hwan Kim, B. Chang
{"title":"A Study on Using Large-Scale Energy Storage Systems in Automatic Generation Control Operations of the Energy Management Systems","authors":"Ji-Hoon Im, Gun-Pyo Lim, Chan-Wook Park, Yohan Choi, Seung-Hwan Kim, B. Chang","doi":"10.18770/KEPCO.2016.02.01.121","DOIUrl":null,"url":null,"abstract":"KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update.","PeriodicalId":445819,"journal":{"name":"KEPCO Journal on electric power and energy","volume":"11 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"KEPCO Journal on electric power and energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18770/KEPCO.2016.02.01.121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
大型储能系统在能源管理系统自动发电控制运行中的应用研究
韩国电力公司完成了用于频率调节的52兆瓦电池储能系统(BESS)的安装和演示。其中,24mw BESS用于新永仁变电站的自动发电控制(AGC)。最近,韩国电力研究院开始运营与KPX EMS相关的设备。本文通过对24mw BESS在AGC运行中的应用研究,探讨了EMS的运行策略,并提出了对AGC目标的改进。期望通过本文的不断更新,为AGC ESS的安全可靠运行和控制提供帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Technical Trend of IoT for Electric Power Industry A VEE Algorithm Improvement Research for Improving Estimation Accuracy and Verification Responsibility of The AMI Meter Data Microcontroller-based Chaotic Signal Generator for Securing Power Line Communication: Part I-A System View Corrosion Monitoring for Offshore Wind Farm's Substructures by using Electrochemical Noise Sensors Technical Feasibility Study on the Biomimetic Drone for Inspection of Electric Power Lines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1