{"title":"Research on evaluation of engineering changes under bill of quantities mode","authors":"Tao Ding, Ling Zhang, Zhenshui Wang","doi":"10.1109/WARTIA.2014.6976311","DOIUrl":null,"url":null,"abstract":"Engineering changes are not just critical evidences for engineering settlement between the two contracting parties in engineering construction, but also involve in the reallocation of responsibilities and risks such as laws, regulations, structural safety, technical standards, engineering scope, government acceptance, government supervision on quality and safety, health and epidemic prevention, planning, quality standards and fire control, etc. The feasibility evaluation on engineering changes under bill of quantities mode can better reflect its importance and necessity. Based on summary and review of a large number of examples of engineering changes, the thesis puts forward evaluation ideas and suggestions for engineering changes under bill of quantities mode, and hopes to provide certain instructions for management of subsequent engineering changes in the future.","PeriodicalId":288854,"journal":{"name":"2014 IEEE Workshop on Advanced Research and Technology in Industry Applications (WARTIA)","volume":"152 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Workshop on Advanced Research and Technology in Industry Applications (WARTIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WARTIA.2014.6976311","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Engineering changes are not just critical evidences for engineering settlement between the two contracting parties in engineering construction, but also involve in the reallocation of responsibilities and risks such as laws, regulations, structural safety, technical standards, engineering scope, government acceptance, government supervision on quality and safety, health and epidemic prevention, planning, quality standards and fire control, etc. The feasibility evaluation on engineering changes under bill of quantities mode can better reflect its importance and necessity. Based on summary and review of a large number of examples of engineering changes, the thesis puts forward evaluation ideas and suggestions for engineering changes under bill of quantities mode, and hopes to provide certain instructions for management of subsequent engineering changes in the future.