Early assessment of grid code requirements for wind power plant in vestas

Y. Zhan, P. Zhao
{"title":"Early assessment of grid code requirements for wind power plant in vestas","authors":"Y. Zhan, P. Zhao","doi":"10.1109/IPEC.2010.5543449","DOIUrl":null,"url":null,"abstract":"Grid code requirements on wind power plant are becoming more stringent as the wind power penetration level increasing. In order to identify the risk of incompliance with grid code requirements at the planning stage of a wind power plant project, a standard grid code study process has been established in Vestas. The study process includes steady state load flow, short circuit studies and transient low voltage ride through study. A suitable reactive power compensation device is identified from the study. An example study case is also included in this paper.","PeriodicalId":353540,"journal":{"name":"The 2010 International Power Electronics Conference - ECCE ASIA -","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 2010 International Power Electronics Conference - ECCE ASIA -","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEC.2010.5543449","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Grid code requirements on wind power plant are becoming more stringent as the wind power penetration level increasing. In order to identify the risk of incompliance with grid code requirements at the planning stage of a wind power plant project, a standard grid code study process has been established in Vestas. The study process includes steady state load flow, short circuit studies and transient low voltage ride through study. A suitable reactive power compensation device is identified from the study. An example study case is also included in this paper.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
维斯塔斯风力发电厂电网规范要求的早期评估
随着风电渗透水平的提高,电网规范对风电场的要求也越来越严格。为了识别风电场项目规划阶段不符合电网规范要求的风险,维斯塔斯建立了标准的电网规范研究流程。研究过程包括稳态潮流研究、短路研究和瞬态低压穿越研究。通过研究确定了合适的无功补偿装置。本文还提供了一个实例研究案例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Periodic learning suppression control of torque ripple utilizing system identification for permanent magnet synchronous motors Dead-time effect and its compensation in common-mode voltage elimination of PWM inverter with auxiliary inverter Optimal design of resonant converter for Electrostatic Precipitators Control algorithm of renewable energy power plant supplied by fuel cell/solar cell/ supercapacitor power source Coordination control of bi-articular robotic arm by motor drive with planetary gear
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1