{"title":"Modernization of the New York City subway: latest update on the Canarsie Line project","authors":"C. Braban, N. Ghaly","doi":"10.1109/RRCON.2006.215318","DOIUrl":null,"url":null,"abstract":"After presenting the requirements specified by NYCT in terms of re-signaling, this paper addresses Phase II - re-signaling the Canarsie Line and Phase III - Demonstration of Interoperability. It focuses on the key technical assets of the CBTC installed on the Canarsie Line. It discusses the challenge of re-signaling the Canarsie Line during 24/7 revenue service and presents the cut-over strategy applied. The paper provides the current progress (as of February 10, 2006) on the re-signaling project itself and on the interoperability issue","PeriodicalId":292357,"journal":{"name":"Proceedings of the 2006 IEEE/ASME Joint Rail Conference","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2006 IEEE/ASME Joint Rail Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RRCON.2006.215318","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
After presenting the requirements specified by NYCT in terms of re-signaling, this paper addresses Phase II - re-signaling the Canarsie Line and Phase III - Demonstration of Interoperability. It focuses on the key technical assets of the CBTC installed on the Canarsie Line. It discusses the challenge of re-signaling the Canarsie Line during 24/7 revenue service and presents the cut-over strategy applied. The paper provides the current progress (as of February 10, 2006) on the re-signaling project itself and on the interoperability issue