Modernization of the New York City subway: latest update on the Canarsie Line project

C. Braban, N. Ghaly
{"title":"Modernization of the New York City subway: latest update on the Canarsie Line project","authors":"C. Braban, N. Ghaly","doi":"10.1109/RRCON.2006.215318","DOIUrl":null,"url":null,"abstract":"After presenting the requirements specified by NYCT in terms of re-signaling, this paper addresses Phase II - re-signaling the Canarsie Line and Phase III - Demonstration of Interoperability. It focuses on the key technical assets of the CBTC installed on the Canarsie Line. It discusses the challenge of re-signaling the Canarsie Line during 24/7 revenue service and presents the cut-over strategy applied. The paper provides the current progress (as of February 10, 2006) on the re-signaling project itself and on the interoperability issue","PeriodicalId":292357,"journal":{"name":"Proceedings of the 2006 IEEE/ASME Joint Rail Conference","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2006 IEEE/ASME Joint Rail Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RRCON.2006.215318","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

After presenting the requirements specified by NYCT in terms of re-signaling, this paper addresses Phase II - re-signaling the Canarsie Line and Phase III - Demonstration of Interoperability. It focuses on the key technical assets of the CBTC installed on the Canarsie Line. It discusses the challenge of re-signaling the Canarsie Line during 24/7 revenue service and presents the cut-over strategy applied. The paper provides the current progress (as of February 10, 2006) on the re-signaling project itself and on the interoperability issue
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
纽约市地铁的现代化:卡纳西线项目的最新进展
在介绍了NYCT在重新信令方面指定的要求之后,本文讨论了第二阶段-重新信令Canarsie线和第三阶段-互操作性演示。它侧重于安装在加拿大线的CBTC的关键技术资产。它讨论了在24/7收入服务期间重新发送Canarsie线信号的挑战,并介绍了所应用的切换策略。该文件提供了重信令项目本身和互操作性问题的当前进展(截至2006年2月10日)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An autonomous, low cost, distributed method for observing vehicle track interactions Simplified representation of rigging efficiency in brake force calculation Managing the gross weight on rail A computer vision system for monitoring the energy efficiency of intermodal trains Practical issues of system integration on the Taipei MRT System
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1