Suape Container Terminal: Evaluating a Berth Reservation Scheme

H. Florez
{"title":"Suape Container Terminal: Evaluating a Berth Reservation Scheme","authors":"H. Florez","doi":"10.1108/CASE.CSCMP.2018.000022","DOIUrl":null,"url":null,"abstract":"The COO for Suape Container Terminal, the largest deep–water port in Brazil's Northeast must consider a proposal presented by the users' council that calls for the establishment of a reservation scheme that minimizes the risk of docking delays. Under this proposal, ocean carriers, on the one hand, agree to pay a reservation fee that significantly increases revenue for Tecon Suape. On the other hand, they expect Tecon Suape to compensate them financially when a berth is not available upon vessel arrival. Tecon Suape's management team must evaluate that suggestion, as the team prepares to enter contractual negotiations with the users.","PeriodicalId":294349,"journal":{"name":"Council of Supply Chain Management Professionals Cases","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Council of Supply Chain Management Professionals Cases","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CASE.CSCMP.2018.000022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The COO for Suape Container Terminal, the largest deep–water port in Brazil's Northeast must consider a proposal presented by the users' council that calls for the establishment of a reservation scheme that minimizes the risk of docking delays. Under this proposal, ocean carriers, on the one hand, agree to pay a reservation fee that significantly increases revenue for Tecon Suape. On the other hand, they expect Tecon Suape to compensate them financially when a berth is not available upon vessel arrival. Tecon Suape's management team must evaluate that suggestion, as the team prepares to enter contractual negotiations with the users.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
香港货柜码头:评估泊位预留计划
巴西东北部最大的深水港Suape集装箱码头的首席运营官必须考虑用户委员会提出的一项建议,该建议要求建立一个预订方案,以最大限度地降低停靠延误的风险。根据这一提议,海运承运人一方面同意支付预订费,这将大大增加Tecon Suape的收入。另一方面,如果船舶到达时没有泊位,他们希望Tecon Suape在经济上对他们进行补偿。Tecon Suape的管理团队必须评估这一建议,因为该团队准备与用户进行合同谈判。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
BlueStar Office Supply Company Steel Corp: Using Logistics Criteria to Segment Customers GHP Bearings: Strategically Mapping the Supply Chain Farmco: The Complexity of Evaluating Suppliers Suape Container Terminal: Evaluating a Berth Reservation Scheme
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1