{"title":"A comparison of contracting methods for bored pile (drilled shaft) construction between Europe and North America","authors":"D. Coleman, A. Tipter","doi":"10.1080/19375247.2016.1253164","DOIUrl":null,"url":null,"abstract":"Delivery techniques involving conventional and non-conventional contracting methods in North America (NA) and Europe are presented for the construction of bored pile (drilled shaft) foundations. For the purpose of this paper, NA and European Specialty Foundation Contractors (SFCs) were polled through the Deep Foundations Institute (DFI) to determine common practices, issues, views and experiences facing the SFC during the installation of deep foundations. Additional information was compiled from research on the subject matter. Comparisons are provided pertaining to: contracting methods, document forms, payment, contracting provisions, regional influences and cultural differences involving language barriers and currency. In addition, the authors have considered and summarised the common aspects, trends and how the evolution of these methods has impacted or altered the North American/European SFC's business model. It should be noted that the authors' reference to NA refers to the United States, while Europe refers to members of the European Union, with emphasis on the United Kingdom and Germany.","PeriodicalId":272645,"journal":{"name":"DFI Journal - The Journal of the Deep Foundations Institute","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DFI Journal - The Journal of the Deep Foundations Institute","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/19375247.2016.1253164","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Delivery techniques involving conventional and non-conventional contracting methods in North America (NA) and Europe are presented for the construction of bored pile (drilled shaft) foundations. For the purpose of this paper, NA and European Specialty Foundation Contractors (SFCs) were polled through the Deep Foundations Institute (DFI) to determine common practices, issues, views and experiences facing the SFC during the installation of deep foundations. Additional information was compiled from research on the subject matter. Comparisons are provided pertaining to: contracting methods, document forms, payment, contracting provisions, regional influences and cultural differences involving language barriers and currency. In addition, the authors have considered and summarised the common aspects, trends and how the evolution of these methods has impacted or altered the North American/European SFC's business model. It should be noted that the authors' reference to NA refers to the United States, while Europe refers to members of the European Union, with emphasis on the United Kingdom and Germany.
介绍了北美和欧洲钻孔灌注桩(钻孔竖井)基础施工的常规和非常规承包方式的交付技术。为了本文的目的,我们通过Deep Foundations Institute (DFI)对NA和欧洲的专业地基承包商(SFC)进行了调查,以确定SFC在安装深地基时面临的常见做法、问题、观点和经验。其他资料是从对该主题的研究中汇编而来的。比较内容包括:订约方法、文件形式、付款、订约条款、区域影响和涉及语言障碍和货币的文化差异。此外,作者还考虑并总结了这些方法的共同方面、趋势以及这些方法的演变如何影响或改变了北美/欧洲证监会的商业模式。应该指出的是,作者提到的NA指的是美国,而Europe指的是欧盟成员国,重点是英国和德国。