{"title":"IEEE Standard for High-Voltage Gas-Insulated Substations Rated Above 52 kV","authors":"","doi":"10.1109/IEEESTD.2021.9525322","DOIUrl":null,"url":null,"abstract":"The technical requirements for the design, fabrication, testing, and installation of a gas insulated substations are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation details to be furnished by the manufacturer are established.","PeriodicalId":153343,"journal":{"name":"IEEE Std C37.122-2021 (Revision of IEEE Std C37.122-2010)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Std C37.122-2021 (Revision of IEEE Std C37.122-2010)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEESTD.2021.9525322","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
The technical requirements for the design, fabrication, testing, and installation of a gas insulated substations are covered. The parameters to be supplied by the purchaser are set, and the technical requirements for the design, fabrication, testing, and installation details to be furnished by the manufacturer are established.