Upper Structure of Precast Concretes Comparison: PC-I and PC-U in West Outer Ring Road, Surabaya

J. Propika, Y. Septiarsilia, E. Susanti, H. Istiono
{"title":"Upper Structure of Precast Concretes Comparison: PC-I and PC-U in West Outer Ring Road, Surabaya","authors":"J. Propika, Y. Septiarsilia, E. Susanti, H. Istiono","doi":"10.30736/cvl.v7i2.882","DOIUrl":null,"url":null,"abstract":"Increasing of motorcycle numbers in big cities in Indonesia, especially in Surabaya. The traffic becomes crowded and road capacity is exceeded. Because of the increasing of motorcycle volume, especially in western part of Surabaya, the government built a flyover in west outer ring road to provide solution to congestion in Surabaya. This study aimed to determine the comparation between PC-I girder and PC-U girder used. In west outer ring road, the method was used to calculate prestressed beam was fully prestressed. The researcher reviewed the prestressed beam from behavior, reaction, and impact to the all of bridge structures from structure. The Software SAP 2000 V.14.2.5 is used to structure calculation analysis. According to analysis result, the calculation has been carried out, the difference ratio of the bridge floor slabs was studied. Flyover model with PC-U prestressed beam had smaller ratio than PC-I. The comparison of strand used in PC-U beams was more than PC-I with 42.22%. The maximum moment value was occurred in PC-I girder beam was 1541.979 Tons.meter and PC-U girder was 2252.599 Tons.meter. The strand requirements and cross area section was comparised too.","PeriodicalId":282199,"journal":{"name":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","volume":"214 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/cvl.v7i2.882","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Increasing of motorcycle numbers in big cities in Indonesia, especially in Surabaya. The traffic becomes crowded and road capacity is exceeded. Because of the increasing of motorcycle volume, especially in western part of Surabaya, the government built a flyover in west outer ring road to provide solution to congestion in Surabaya. This study aimed to determine the comparation between PC-I girder and PC-U girder used. In west outer ring road, the method was used to calculate prestressed beam was fully prestressed. The researcher reviewed the prestressed beam from behavior, reaction, and impact to the all of bridge structures from structure. The Software SAP 2000 V.14.2.5 is used to structure calculation analysis. According to analysis result, the calculation has been carried out, the difference ratio of the bridge floor slabs was studied. Flyover model with PC-U prestressed beam had smaller ratio than PC-I. The comparison of strand used in PC-U beams was more than PC-I with 42.22%. The maximum moment value was occurred in PC-I girder beam was 1541.979 Tons.meter and PC-U girder was 2252.599 Tons.meter. The strand requirements and cross area section was comparised too.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预制混凝土上部结构比较:泗水西外环PC-I和PC-U
印尼大城市摩托车数量增加,尤其是泗水。交通变得拥挤,道路容量超过。由于摩托车数量的增加,特别是在泗水西部地区,政府在西外环线上修建了一座立交桥,以解决泗水的拥堵问题。本研究旨在确定PC-I型梁与PC-U型梁的比较。在西外环公路上,采用该方法计算预应力梁为全预应力。从结构的角度对预应力梁的受力、反作用力和对桥梁结构的影响进行了综述。采用SAP 2000 V.14.2.5软件进行结构计算分析。根据分析结果进行了计算,对桥梁楼板的差比进行了研究。PC-U预应力梁立交桥模型比PC-I预应力梁立交桥模型的比要小。PC-U梁采用的钢绞线比PC-I梁多42.22%。pc - 1梁的最大弯矩值为1541.979 t。PC-U型梁为2252.599吨米。并对钢绞线要求和横截面进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Concrete Strength Analysis K-250 With Additional Asbestos Waste Powder as a Substitute of Fine Aggregate The Shear Strength of Clay Stabilized with Palm Bunch Ash and Cement Evaluation of Wastewater Management System Implementation in Tarakan City Selumit Beach Area Analysis of Determinants of Consumer Decisions on the Use of Trans Banyumas and Gojek Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1