{"title":"A Systematic Approach in Methodology for Permanent Plug Placement in Deepwater Subsea Plug and Abandonment Campaign","authors":"M. S. M. Allapitchai, Ahmad Johan, W. Liew, S. Sellapan, Khalil Ould Mohamed M’Bareck, Ahmad Hafizi Ahmad Zaini, M. A. Abdul Razak","doi":"10.2523/iptc-22892-ms","DOIUrl":null,"url":null,"abstract":"\n Wells plug & abandonment was carried out in a deepwater field (Field C) offshore West Africa. There were 15 deepwater subsea wells, in this field. Thirteen of the wells were completed with Open Water Vertical Xmas Tree (OXT) while remaining two were completed with Enhanced Vertical Xmas Tree (EVXT). All the wells were permanently abandoned with permanent barriers established in accordance to Norsok D-010, rev 4. (2013). This involved establishing well barriers which would both horizontally and vertically effective. Plug and abandonment in a subsea environment remains a major challenge most operators face around the world. This paper will discuss the systematic approach to establish the methodology for plug placement by Operator for installing permanent abandonment barriers in their campaign.\n The paper shall discuss the systematic approach in permanent plug placement as well as highlight challenges and lessons learnts. The paper discusses the guidelines and philosophy to devise methodology for permanent plug placement based on industry capability. The paper also shares the novel approach in devising Plug Placement decision tree as well as well as explanation on principle behind the method. The paper will share on the process flow used by Operator for the permanent abandonment of these wells. Other than that, paper shall highlight the implementation of the decision tree during operations with examples. The best practices and lessons learnts in the plug placement methodology implementation during Operator's campaign in subsea plug and abandonment shall also be discussed in this paper. Ultimately, the paper shall also share on the recommendation for future subsea abandonment planning to assist Operator in their planning.","PeriodicalId":153269,"journal":{"name":"Day 2 Thu, March 02, 2023","volume":"80 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Thu, March 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22892-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Wells plug & abandonment was carried out in a deepwater field (Field C) offshore West Africa. There were 15 deepwater subsea wells, in this field. Thirteen of the wells were completed with Open Water Vertical Xmas Tree (OXT) while remaining two were completed with Enhanced Vertical Xmas Tree (EVXT). All the wells were permanently abandoned with permanent barriers established in accordance to Norsok D-010, rev 4. (2013). This involved establishing well barriers which would both horizontally and vertically effective. Plug and abandonment in a subsea environment remains a major challenge most operators face around the world. This paper will discuss the systematic approach to establish the methodology for plug placement by Operator for installing permanent abandonment barriers in their campaign. The paper shall discuss the systematic approach in permanent plug placement as well as highlight challenges and lessons learnts. The paper discusses the guidelines and philosophy to devise methodology for permanent plug placement based on industry capability. The paper also shares the novel approach in devising Plug Placement decision tree as well as well as explanation on principle behind the method. The paper will share on the process flow used by Operator for the permanent abandonment of these wells. Other than that, paper shall highlight the implementation of the decision tree during operations with examples. The best practices and lessons learnts in the plug placement methodology implementation during Operator's campaign in subsea plug and abandonment shall also be discussed in this paper. Ultimately, the paper shall also share on the recommendation for future subsea abandonment planning to assist Operator in their planning.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在深水水下桥塞和弃桥作业中,永久性桥塞放置的系统方法
在西非海上的一个深水油田(油田C)进行了井塞弃井作业。该油田共有15口深水海底井。其中13口井采用开放水域垂直采油树(OXT)完成,其余2口井采用增强型垂直采油树(EVXT)完成。根据Norsok D-010 rev 4的规定,所有井都被永久废弃,并建立了永久性屏障。(2013)。这包括建立井眼屏障,在水平和垂直方向上都有效。海底环境下的桥塞弃井仍然是全球大多数运营商面临的主要挑战。本文将讨论一种系统的方法,以建立作业者在作业中安装永久弃井屏障的桥塞放置方法。本文将讨论永久性桥塞安置的系统方法,并强调挑战和经验教训。本文讨论了基于行业能力设计永久性桥塞的指导原则和理念。本文还介绍了设计桥塞投放决策树的新方法,并对该方法的原理进行了说明。本文将分享作业者永久弃井所使用的工艺流程。除此之外,论文还将通过实例强调决策树在操作过程中的实现。本文还将讨论运营商在海底桥塞和弃井作业期间实施桥塞放置方法的最佳实践和经验教训。最后,本文还将分享对未来海底废弃规划的建议,以帮助作业者进行规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Advancement of Open Hole Gravel Pack and Zonal Isolation with Selective Intelligent Completion in Deepwater Malaysia Reaching Beyond the Limit, the Furthest Step Out S Shape Wells in Deep Gas Well Project Application and Performance Monitoring of Compound Air Plasma Lightning Rejection System Malaysia's First Use of Subsea Release Plug System for Dual Barrier Offline Cementing (DBOC) Across Hydrocarbon Section Helps Streamline Activities Drilling Weak Formations in Rumaila Field in Southern Iraq — Modelling Shear Failure Using Numerical Models
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1