{"title":"Managing Uncertainties in Wind Farm Harmonic Studies Using Unscented Transform","authors":"O. Lennerhag, M. Bollen","doi":"10.1109/ICHQP53011.2022.9808772","DOIUrl":null,"url":null,"abstract":"Uncertainties in power system studies are often considered using Monte Carlo methods, or by the use of deterministic methods, often based on some worst-case assumptions. With an increasing number of uncertainties, there is a need for methods that can estimate statistical parameters from a limited number of calculations. This paper utilizes a method called the Unscented Transform together with Cornish-Fisher expansion to calculate harmonic distortion at the point of connection of a wind farm under different uncertainties. The method is shown to be able to estimate the 95% value of individual harmonics accurately when considering variations in emission and impedance, using only a limited number of calculations.","PeriodicalId":249133,"journal":{"name":"2022 20th International Conference on Harmonics & Quality of Power (ICHQP)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 20th International Conference on Harmonics & Quality of Power (ICHQP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHQP53011.2022.9808772","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Uncertainties in power system studies are often considered using Monte Carlo methods, or by the use of deterministic methods, often based on some worst-case assumptions. With an increasing number of uncertainties, there is a need for methods that can estimate statistical parameters from a limited number of calculations. This paper utilizes a method called the Unscented Transform together with Cornish-Fisher expansion to calculate harmonic distortion at the point of connection of a wind farm under different uncertainties. The method is shown to be able to estimate the 95% value of individual harmonics accurately when considering variations in emission and impedance, using only a limited number of calculations.