Identifying the causes of poor progress in software projects

A. Rainer, T. Hall
{"title":"Identifying the causes of poor progress in software projects","authors":"A. Rainer, T. Hall","doi":"10.1109/METRIC.2004.1357902","DOIUrl":null,"url":null,"abstract":"We present data on the progress of two projects at IBM Hursley Park. Each project lasted approximately 12 months in duration. We use the data to identify the areas in the projects where poor progress was occurring and to investigate the causes of this poor progress. We find some similarities between the two projects in terms of where some poor progress is occurring i.e. with the design, code and test processes. But we also identify differences between the two projects that can be partially explained by the dependency of these two projects on other parts of IBM. We also find that limited quantitative data is reported in the projects, and that there is little explicit comparison of actual progress with planned progress. Indeed, the reporting of progress seems to be affected by factors like the 'deadline effect' and preferences for reporting certain types of progress. We conclude that these factors may threaten the valid reporting and management of the projects.","PeriodicalId":261807,"journal":{"name":"10th International Symposium on Software Metrics, 2004. Proceedings.","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Symposium on Software Metrics, 2004. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/METRIC.2004.1357902","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

We present data on the progress of two projects at IBM Hursley Park. Each project lasted approximately 12 months in duration. We use the data to identify the areas in the projects where poor progress was occurring and to investigate the causes of this poor progress. We find some similarities between the two projects in terms of where some poor progress is occurring i.e. with the design, code and test processes. But we also identify differences between the two projects that can be partially explained by the dependency of these two projects on other parts of IBM. We also find that limited quantitative data is reported in the projects, and that there is little explicit comparison of actual progress with planned progress. Indeed, the reporting of progress seems to be affected by factors like the 'deadline effect' and preferences for reporting certain types of progress. We conclude that these factors may threaten the valid reporting and management of the projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定软件项目进展缓慢的原因
我们介绍了IBM Hursley Park的两个项目的进展数据。每个项目持续了大约12个月。我们使用这些数据来确定项目中出现不良进展的区域,并调查导致这种不良进展的原因。我们发现这两个项目有一些相似之处,即在设计、代码和测试过程中出现了一些糟糕的进展。但是我们也发现了这两个项目之间的差异,这可以部分地解释为这两个项目对IBM其他部分的依赖。我们还发现,在项目中报告的定量数据有限,并且很少有实际进展与计划进展的明确比较。事实上,进度报告似乎受到“最后期限效应”和报告某些类型进度的偏好等因素的影响。这些因素可能会威胁到项目的有效报告和管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The necessity of assuring quality in software measurement data Resource estimation for Web applications A survey on software estimation in the Norwegian industry A controlled experiment for evaluating a metric-based reading technique for requirements inspection Assessing usability through perceptions of information scent
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1