{"title":"Optimisasi Operasi Pemboran Di Basin Afrika Utara","authors":"Aly Rasyid","doi":"10.25105/PETRO.V10I2.8809","DOIUrl":null,"url":null,"abstract":"Drilling optimization objective was to reduce costs, improve wellbore conditions and integrity for increasingly challenging reservoirs while establishing maximum safety performance and environmental custodianship. Even though the final result of a drilling operation is easily observed, what almost always goes unnoticed is the complexity of the issues involved in the planning and execution of a drilling operation and the number of topics involved in such a process. In this paper, as case study of the exploration drilling in Hamada region, North Africa has been evaluated. Over the period of 2006 to 2011, continued drilling improvement was achieved. Key elements in the optimization included focus on management drilling team structure, engineering well planning, improvements on managing drilling operations such as on site safety management practices, and also post drill analysis to implement lesson learn for the next well to be drilled. As the result, while drilling 26 wells during the 2006 until 2011, drilling days were successfully reduced from 87 days (first well) to the average 40 days, and very good safety record performance. Keywords : optimization, drilling cost, drilling performance","PeriodicalId":435945,"journal":{"name":"PETRO:Jurnal Ilmiah Teknik Perminyakan","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PETRO:Jurnal Ilmiah Teknik Perminyakan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/PETRO.V10I2.8809","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Drilling optimization objective was to reduce costs, improve wellbore conditions and integrity for increasingly challenging reservoirs while establishing maximum safety performance and environmental custodianship. Even though the final result of a drilling operation is easily observed, what almost always goes unnoticed is the complexity of the issues involved in the planning and execution of a drilling operation and the number of topics involved in such a process. In this paper, as case study of the exploration drilling in Hamada region, North Africa has been evaluated. Over the period of 2006 to 2011, continued drilling improvement was achieved. Key elements in the optimization included focus on management drilling team structure, engineering well planning, improvements on managing drilling operations such as on site safety management practices, and also post drill analysis to implement lesson learn for the next well to be drilled. As the result, while drilling 26 wells during the 2006 until 2011, drilling days were successfully reduced from 87 days (first well) to the average 40 days, and very good safety record performance. Keywords : optimization, drilling cost, drilling performance
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
北非盆地压裂行动的优化
钻井优化的目标是降低成本,改善井眼条件和油藏的完整性,同时建立最大的安全性能和环境监管。尽管钻井作业的最终结果很容易观察到,但几乎总是被忽视的是,钻井作业的规划和执行所涉及的问题的复杂性,以及这一过程中涉及的主题的数量。本文以北非滨田地区勘探钻井为例,对其进行了评价。在2006年至2011年期间,实现了持续的钻井改进。优化的关键要素包括管理钻井团队结构、工程井规划、改进钻井作业管理(如现场安全管理实践),以及钻后分析,以便为下一口井提供经验教训。结果,在2006年至2011年期间,共钻了26口井,成功地将钻井时间从87天(第一口井)减少到平均40天,并取得了良好的安全记录。关键词:优化,钻井成本,钻井性能
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH PENAMBAHAN BUBUK KULIT PISANG TERHADAP FILTRATION LOSS DAN MUD CAKE PADA LUMPUR BERBAHAN DASAR AIR TAWAR UNTUK TEMPERATUR 80oF DAN 200oF EVALUASI PENANGGULANGAN LOST CIRCULATION LAPANGAN X IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD STUDY OF PERMEABILITY PREDICTION USING HYDRAULIC FLOW UNIT (HFU) AND MACHINE LEARNING METHOD IN “BSH” FIELD USULAN REPERFORASI SUMUR S UNTUK OPTIMASI PRODUKSI
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1