{"title":"SIMULATION MODEL FOR TUNNEL CONSTRUCTION COSTS","authors":"F. Moavenzadeh, M. Markow","doi":"10.1061/JCCEAZ.0000600","DOIUrl":null,"url":null,"abstract":"A computer-based Tunnel Cost Model has been developed. The model includes three submodels: a geologic submodel, a construction submodel, and a tunnel simulator. The geologic model uses the available geologic information expressed in terms of subjective probabilities to generate the likelihood of occurrence of various geologic conditions at defined locations in the tunnel. The construction submodel simulates cycles of construction operations under the various possible geologic conditions to assess the impact of these operations on time and cost. The tunnel simulator brings together the information produced by the two other submodels to simulate cycles of construction operations in many possible geologic profiles. Results of these simulations are time/cost distributions reflecting the uncertainty inherent in the estimate. An example problem of a 12,000-ft tunnel in shale/limestone geology is presented. Results indicate a range of total direct cost of –7,500,000-–10,500,000, and a time of 210 days to 305 days. These ranges provide a quantitative indication of the uncertainty inherent in a final tunnel time and cost estimate.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1976-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000600","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

A computer-based Tunnel Cost Model has been developed. The model includes three submodels: a geologic submodel, a construction submodel, and a tunnel simulator. The geologic model uses the available geologic information expressed in terms of subjective probabilities to generate the likelihood of occurrence of various geologic conditions at defined locations in the tunnel. The construction submodel simulates cycles of construction operations under the various possible geologic conditions to assess the impact of these operations on time and cost. The tunnel simulator brings together the information produced by the two other submodels to simulate cycles of construction operations in many possible geologic profiles. Results of these simulations are time/cost distributions reflecting the uncertainty inherent in the estimate. An example problem of a 12,000-ft tunnel in shale/limestone geology is presented. Results indicate a range of total direct cost of –7,500,000-–10,500,000, and a time of 210 days to 305 days. These ranges provide a quantitative indication of the uncertainty inherent in a final tunnel time and cost estimate.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
隧道工程造价仿真模型
建立了基于计算机的隧道成本模型。该模型包括三个子模型:地质子模型、施工子模型和隧道模拟器。地质模型利用现有的以主观概率表示的地质信息,生成隧道内确定位置发生各种地质条件的可能性。施工子模型模拟了各种可能的地质条件下施工作业的周期,以评估这些作业对时间和成本的影响。隧道模拟器将另外两个子模型产生的信息结合起来,在许多可能的地质剖面中模拟施工周期。这些模拟的结果是反映估计中固有的不确定性的时间/成本分布。给出了一个在页岩/石灰岩地质中12,000英尺隧道的实例问题。结果表明,总直接成本为- 750万~ 1050万美元,工期为210天~ 305天。这些范围提供了最终隧道时间和成本估算中固有的不确定性的定量指示。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Closure of "An optimum Bid Approximation Model" Construction of Offshore Platforms Prevention and Resolution of Construction Claims The Resident Engineer: Intermediary Between Owner and Contractor Graphical Method of Optimization: A Short Cut
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1