{"title":"Resource Scheduling Algorithm of Space Objects Surveillance for Collision Warning","authors":"Li Bo, Li Daqi","doi":"10.1109/ISDEA.2012.474","DOIUrl":null,"url":null,"abstract":"Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.","PeriodicalId":267532,"journal":{"name":"2012 Second International Conference on Intelligent System Design and Engineering Application","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Second International Conference on Intelligent System Design and Engineering Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISDEA.2012.474","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.