Factors Affecting Cost Overrun of RC-PIER Jabodebek LRT Project : A Case Study of Cawang, Indonesia

Yurisdal, B. Susetyo
{"title":"Factors Affecting Cost Overrun of RC-PIER Jabodebek LRT Project : A Case Study of Cawang, Indonesia","authors":"Yurisdal, B. Susetyo","doi":"10.31695/ijerat.2019.3436","DOIUrl":null,"url":null,"abstract":"Light Rail Transit Development in Indonesia is progressing quite rapidly. Light Rail Transit is one of the modes of transportation solutions in the capital. The reason for the construction LRT because it more easily integrated with MRT and KRL. Due to the shortage of land in the capital, Jakarta. The system will use the system structure model structure elevated structure (cross-over structure), where pier structure is the structure of reinforced concrete columns (RC-Pier). At the time of execution occurs because the cost overrun earlier methods used inefficiently. Therefore, researchers will discuss the factors that affect the cost of crusting of 16:25% of the budget plan at work implementation RC-Pier in the LRT Jabodebek. Researchers using SPSS as the tool to get the factors that affect the cost of the implementation of the work crusting RC-Pier in LRT Jabodebek Project location of CawangDukuh Atas. The results of this study the factors that affect the efficiency gain is planning inadequate project, management, control and structure a bad project, project funding is inadequate, does not account for unexpected costs, inaccurate estimates/cost estimates are too low, collect information complete, resource constraints, the cost of construction of the LRT, the lack of experience of consultants, contractors and project managers and changes in design specifications.","PeriodicalId":424923,"journal":{"name":"International Journal of Engineering Research and Advanced Technology","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31695/ijerat.2019.3436","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Light Rail Transit Development in Indonesia is progressing quite rapidly. Light Rail Transit is one of the modes of transportation solutions in the capital. The reason for the construction LRT because it more easily integrated with MRT and KRL. Due to the shortage of land in the capital, Jakarta. The system will use the system structure model structure elevated structure (cross-over structure), where pier structure is the structure of reinforced concrete columns (RC-Pier). At the time of execution occurs because the cost overrun earlier methods used inefficiently. Therefore, researchers will discuss the factors that affect the cost of crusting of 16:25% of the budget plan at work implementation RC-Pier in the LRT Jabodebek. Researchers using SPSS as the tool to get the factors that affect the cost of the implementation of the work crusting RC-Pier in LRT Jabodebek Project location of CawangDukuh Atas. The results of this study the factors that affect the efficiency gain is planning inadequate project, management, control and structure a bad project, project funding is inadequate, does not account for unexpected costs, inaccurate estimates/cost estimates are too low, collect information complete, resource constraints, the cost of construction of the LRT, the lack of experience of consultants, contractors and project managers and changes in design specifications.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
RC-PIER Jabodebek轻轨项目成本超支影响因素——以印尼Cawang为例
印尼的轻轨交通发展相当迅速。轻轨交通是首都的交通解决方案之一。建设轻轨的原因是它更容易与捷运和京城线整合。由于首都雅加达的土地短缺。本系统将采用体系结构模型结构高架结构(跨桥结构),其中桥墩结构为钢筋混凝土柱结构(RC-Pier)。在执行时由于成本超支而发生,早期的方法使用效率不高。因此,研究人员将在Jabodebek轻轨RC-Pier实施的工作中,讨论影响结皮成本16:25%预算计划的因素。研究人员利用SPSS作为工具,在CawangDukuh Atas的LRT Jabodebek项目位置,获得影响工作结壳RC-Pier实施成本的因素。本研究的结果是影响效率增益的因素是规划不充分的项目,管理,控制和结构不良的项目,项目资金不足,没有考虑到意外成本,不准确的估计/成本估计过低,收集信息完整,资源限制,轻轨的建设成本,缺乏经验的顾问,承包商和项目经理和设计规范的变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Object Boundaries Detection Based Center Of Gravity Optimization of Interval Type-2 Fuzzy Logic System for Software Reliability Prediction Analysis of Quality Control for Automatic Transmission Products MCVT Model By Six Sigma Approach at PT HPPM, Indonesia A New wireless sensor networks Routing Algorithm Based on SPIN Protocols and Circumference Technique Optimization of Production process in Sewing Work for Ethiopia Cultural Clothe Apparel Production
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1