{"title":"Process-centered project management system by stepwise particularizing software process","authors":"K. Genji, M. Ishiwaka, T. Ogihara, K. Inoue","doi":"10.1109/CMPSAC.1993.404213","DOIUrl":null,"url":null,"abstract":"This article proposes a process-centered project management system to facilitate controlling a wide variety of project activities. The essential idea is to employ software process descriptions as vehicles of exchanging activity plans between a project manager and a large number of staff. The system allows a manager to plan and monitor overall project processes which are stepwise particularized according to actual processes dynamically determined by individual staff. By the cooperative process description and stepwise particularization of software processes, a wide variety of software project activities can be coordinated in advance to lead the project to success. This article also proposes a graphical process representation method which maps software processes into a directed graph.<<ETX>>","PeriodicalId":375808,"journal":{"name":"Proceedings of 1993 IEEE 17th International Computer Software and Applications Conference COMPSAC '93","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1993 IEEE 17th International Computer Software and Applications Conference COMPSAC '93","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CMPSAC.1993.404213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
This article proposes a process-centered project management system to facilitate controlling a wide variety of project activities. The essential idea is to employ software process descriptions as vehicles of exchanging activity plans between a project manager and a large number of staff. The system allows a manager to plan and monitor overall project processes which are stepwise particularized according to actual processes dynamically determined by individual staff. By the cooperative process description and stepwise particularization of software processes, a wide variety of software project activities can be coordinated in advance to lead the project to success. This article also proposes a graphical process representation method which maps software processes into a directed graph.<>