Mingang Cheng, M. Sugi, J. Ota, Masashi Yamamoto, Hiroki Ito, Kazuyoshi Inoue
{"title":"A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability","authors":"Mingang Cheng, M. Sugi, J. Ota, Masashi Yamamoto, Hiroki Ito, Kazuyoshi Inoue","doi":"10.1109/COASE.2006.326862","DOIUrl":null,"url":null,"abstract":"In semiconductor manufacturing, rescheduling problems are extremely difficult to solve in real time due to the high frequency of disturbances that occur approximately every minute. This paper proposes a new approach to online manufacturing rescheduling. Unlike the traditional methods to have a scheduling process again, we (1) revise the existing schedule to keep high schedule stability based on message passing rescheduling with operation sorting; and (2) during the manufacturing process, improve the performance of the revised schedule with the introduction of a quick local search on semi-critical paths. In actual problems with about 200,000 processes, this method can effectively accommodate disturbances in less than 1 second, and a better schedule can be obtained in less than 1 minute. This method has been demonstrated to be more effective than conventional dispatching-rule methods, some of which have been actually applied in many facilities, because it offers higher schedule stability and fewer violations of due dates","PeriodicalId":116108,"journal":{"name":"2006 IEEE International Conference on Automation Science and Engineering","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Conference on Automation Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2006.326862","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
In semiconductor manufacturing, rescheduling problems are extremely difficult to solve in real time due to the high frequency of disturbances that occur approximately every minute. This paper proposes a new approach to online manufacturing rescheduling. Unlike the traditional methods to have a scheduling process again, we (1) revise the existing schedule to keep high schedule stability based on message passing rescheduling with operation sorting; and (2) during the manufacturing process, improve the performance of the revised schedule with the introduction of a quick local search on semi-critical paths. In actual problems with about 200,000 processes, this method can effectively accommodate disturbances in less than 1 second, and a better schedule can be obtained in less than 1 minute. This method has been demonstrated to be more effective than conventional dispatching-rule methods, some of which have been actually applied in many facilities, because it offers higher schedule stability and fewer violations of due dates