Security constrained optimal power flow incorporating preventive and corrective control

R. S. Wibowo, Tri Prasetya Fathurrodli, O. Penangsang, A. Soeprijanto
{"title":"Security constrained optimal power flow incorporating preventive and corrective control","authors":"R. S. Wibowo, Tri Prasetya Fathurrodli, O. Penangsang, A. Soeprijanto","doi":"10.1109/EECCIS.2014.7003714","DOIUrl":null,"url":null,"abstract":"This paper proposes an approach for optimal power flow with incorporation of preventive and corrective control. The approach is useful for operation planning to guarantee secure operation under both normal and contingency states. Therefore, the approach consists of main problem and sub problem representing normal and contingency states, respectively. In normal state, preventive control is used to secure the system while in contingency state, corrective control is employed to satisfy system constraints. The objective of main problem is to minimize operation cost while the sub problem is aimed to minimize power generation deviation in order to avoid ramp rate violation. The approach uses iterative process involving normal and contingency states. At contingency state, power redispatch is conducted as corrective control to avoid system violation. If power redispatch violates ramp rate of generator unit, the exceeding power will be fed back to normal state to recalculate the generator output in the normal state. This calculation in normal state is called as preventive control. To show the effectiveness of the proposed approach, IEEE 9 bus system and modified Jawa Bali 25 Bus system is used. The result shows that the proposed approach is able to secure the operation under both normal and contingency states.","PeriodicalId":230688,"journal":{"name":"2014 Electrical Power, Electronics, Communicatons, Control and Informatics Seminar (EECCIS)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Electrical Power, Electronics, Communicatons, Control and Informatics Seminar (EECCIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EECCIS.2014.7003714","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

This paper proposes an approach for optimal power flow with incorporation of preventive and corrective control. The approach is useful for operation planning to guarantee secure operation under both normal and contingency states. Therefore, the approach consists of main problem and sub problem representing normal and contingency states, respectively. In normal state, preventive control is used to secure the system while in contingency state, corrective control is employed to satisfy system constraints. The objective of main problem is to minimize operation cost while the sub problem is aimed to minimize power generation deviation in order to avoid ramp rate violation. The approach uses iterative process involving normal and contingency states. At contingency state, power redispatch is conducted as corrective control to avoid system violation. If power redispatch violates ramp rate of generator unit, the exceeding power will be fed back to normal state to recalculate the generator output in the normal state. This calculation in normal state is called as preventive control. To show the effectiveness of the proposed approach, IEEE 9 bus system and modified Jawa Bali 25 Bus system is used. The result shows that the proposed approach is able to secure the operation under both normal and contingency states.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
安全约束下结合预防和纠正控制的最优潮流
本文提出了一种结合预防控制和纠正控制的最优潮流求解方法。该方法可用于运行规划,以保证在正常和应急状态下的安全运行。因此,该方法由代表正常状态和偶然性状态的主问题和子问题组成。在正常状态下,采用预防控制来保证系统安全;在应急状态下,采用纠正控制来满足系统约束。主问题的目标是使运行成本最小,子问题的目标是使发电偏差最小,以避免坡道速率违规。该方法使用涉及正常和偶然状态的迭代过程。在应急状态下,电力重新调度作为纠正控制,避免系统违规。如果功率重分配违反发电机组的斜坡速率,则将超出的功率反馈到正常状态,重新计算正常状态下的发电机输出。这种正常状态下的计算称为预防控制。为了验证该方法的有效性,采用了ieee9总线系统和改进的java Bali 25总线系统。结果表明,该方法能够保证系统在正常状态和突发状态下的安全运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Design of Small Smart Home system based on Arduino The intelligent energy harvesting management policies in wireless sensor networks with directional water-filling algorithm Assessing readiness of IP networks to support H.323 desktop videoconferencing services over various scheduling techniques using OPNET Enhance quality control management for sensitive industrial products using 2D/3D image processing algorithms Investigations on fractal square loop FSS at oblique incidence for GSM applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1