Optimal Task Scheduling under Moral Hazard & Adverse Selection

M. Agastya, Oleksii Birulin
{"title":"Optimal Task Scheduling under Moral Hazard & Adverse Selection","authors":"M. Agastya, Oleksii Birulin","doi":"10.2139/ssrn.3486561","DOIUrl":null,"url":null,"abstract":"A Principal owns a project consisting of several tasks. Tasks differ, both in their innate success probabilities and their incremental benefits. Moreover, specialists must be engaged to perform these tasks. Subject to moral hazard and adverse selection, in what order should the Principal commission the tasks and when should she terminate the project? What ex-ante investments into changing tasks' characteristics yield the highest marginal profit? These issues arise in diverse areas, from outsourcing drug R&D to sequencing proxy wars. We show that, despite informational constraints, a simple index - a task's effective marginal contribution - determines the optimal schedule/mechanism.","PeriodicalId":119201,"journal":{"name":"Microeconomics: Asymmetric & Private Information eJournal","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Microeconomics: Asymmetric & Private Information eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3486561","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A Principal owns a project consisting of several tasks. Tasks differ, both in their innate success probabilities and their incremental benefits. Moreover, specialists must be engaged to perform these tasks. Subject to moral hazard and adverse selection, in what order should the Principal commission the tasks and when should she terminate the project? What ex-ante investments into changing tasks' characteristics yield the highest marginal profit? These issues arise in diverse areas, from outsourcing drug R&D to sequencing proxy wars. We show that, despite informational constraints, a simple index - a task's effective marginal contribution - determines the optimal schedule/mechanism.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
道德风险与逆向选择下的最优任务调度
一个负责人拥有一个由几个任务组成的项目。任务是不同的,既有其固有的成功概率,也有其增量收益。此外,必须聘请专家来执行这些任务。在道德风险和逆向选择的前提下,委托人应以何种顺序委托任务,何时终止项目?在改变任务特征方面的哪些事前投资能产生最高的边际利润?这些问题出现在不同的领域,从外包药物研发到排序代理战争。我们表明,尽管有信息约束,一个简单的指标——任务的有效边际贡献——决定了最优调度/机制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Quality and Pricing Decisions for Reward-based Crowdfunding: Effects of Moral Hazard Punish Underperformance with Resting Optimal Dynamic Contracts in the Presence of Switching Cost A reconsideration of the Rothschild-Stiglitz insurance market model by information theory Learning from Law Enforcement Pulp Friction: The Value of Quantity Contracts in Decentralized Markets
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1