Electrical Commissioning Owner's Project Requirements: A Template

Brandon Hong, E. Thomason, Aditya M. Deshpande
{"title":"Electrical Commissioning Owner's Project Requirements: A Template","authors":"Brandon Hong, E. Thomason, Aditya M. Deshpande","doi":"10.1109/IGSC55832.2022.9969369","DOIUrl":null,"url":null,"abstract":"As the power demands of Supercomputers continue to grow, so does the demands of the electrical systems that support the infrastructure and building in which these Supercomputers reside. A typical new Supercomputer installation requires an upgrade to the design of the electrical system. As Supercomputers are refreshed roughly every 3 years which in turn drives electrical systems upgrades. The pre-design phase is critical for planning the installation of a new Supercomputer and requires documenting the overarching project purpose, goals, expectations, preferences, and limitations for the electrical systems, especially as the number of stakeholders increases. This Owner's Project Requirements (OPR) document then becomes guidance to the engineering and design teams for the development of the initial basis-of-design and subsequent construction documents. The electrical systems commissioning OPR provides a guideline for stakeholders to make sure that the electrical systems are well designed ‘up-front’ in the process of installation of a new Supercomputer. It also serves as a guiding checklist for the reader to use to inform their own generation of project guiding documents. This document will assist the owner and respective HPC infrastructure stakeholders in writing an OPR for the electrical systems supporting data centers or high-performance computing (HPC) facilities. This paper provides a template for developing an electrical system commissioning OPR. The template is sub-divided into sections that should be discussed and documented as part of the overall project requirements. The expectation is that this outline template forms a starting point for discussions for generating a guiding document for the commissioning of the electrical systems and standardizes the best practices and processes needed for the certification of the electrical commissioning of the HPC Supercomputers facilities.","PeriodicalId":114200,"journal":{"name":"2022 IEEE 13th International Green and Sustainable Computing Conference (IGSC)","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 13th International Green and Sustainable Computing Conference (IGSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IGSC55832.2022.9969369","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As the power demands of Supercomputers continue to grow, so does the demands of the electrical systems that support the infrastructure and building in which these Supercomputers reside. A typical new Supercomputer installation requires an upgrade to the design of the electrical system. As Supercomputers are refreshed roughly every 3 years which in turn drives electrical systems upgrades. The pre-design phase is critical for planning the installation of a new Supercomputer and requires documenting the overarching project purpose, goals, expectations, preferences, and limitations for the electrical systems, especially as the number of stakeholders increases. This Owner's Project Requirements (OPR) document then becomes guidance to the engineering and design teams for the development of the initial basis-of-design and subsequent construction documents. The electrical systems commissioning OPR provides a guideline for stakeholders to make sure that the electrical systems are well designed ‘up-front’ in the process of installation of a new Supercomputer. It also serves as a guiding checklist for the reader to use to inform their own generation of project guiding documents. This document will assist the owner and respective HPC infrastructure stakeholders in writing an OPR for the electrical systems supporting data centers or high-performance computing (HPC) facilities. This paper provides a template for developing an electrical system commissioning OPR. The template is sub-divided into sections that should be discussed and documented as part of the overall project requirements. The expectation is that this outline template forms a starting point for discussions for generating a guiding document for the commissioning of the electrical systems and standardizes the best practices and processes needed for the certification of the electrical commissioning of the HPC Supercomputers facilities.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电气调试业主的项目要求:模板
随着超级计算机的功率需求不断增长,支持这些超级计算机所在的基础设施和建筑的电气系统的需求也在不断增长。一台典型的新超级计算机安装需要对电气系统的设计进行升级。因为超级计算机大约每三年更新一次,这反过来又推动了电气系统的升级。预设计阶段对于规划新超级计算机的安装至关重要,需要记录电气系统的总体项目目的、目标、期望、偏好和限制,特别是当利益相关者数量增加时。业主项目需求(OPR)文件随后成为工程和设计团队制定初始设计基础和后续施工文件的指南。电气系统调试OPR为利益相关者提供了一个指导方针,以确保在安装新超级计算机的过程中,电气系统的“预先”设计良好。它还可以作为一个指导清单,供读者使用,以告知他们自己的项目指导文档。本文档将帮助业主和各自的HPC基础设施利益相关者为支持数据中心或高性能计算(HPC)设施的电气系统编写OPR。本文为电气系统调试OPR的开发提供了一个模板。模板被细分为应该作为整个项目需求的一部分进行讨论和记录的部分。期望这个大纲模板成为讨论的起点,以生成电气系统调试的指导性文件,并标准化HPC超级计算机设施电气调试认证所需的最佳实践和过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Exploring Automatic Gym Workouts Recognition Locally on Wearable Resource-Constrained Devices Toward a Behavioral-Level End-to-End Framework for Silicon Photonics Accelerators A Review of Smart Buildings Protocol and Systems with a Consideration of Security and Energy Awareness Less is More: Learning Simplicity in Datacenter Scheduling Optimizing Energy Efficiency of Node.js Applications with CPU DVFS Awareness
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1