Supply Management by Remanufacturing Company of Mining Equipment

Marlith Roman-Rios, Mitshel Serratti-Ramos, Fernando Maradiegue-Tuesta, J. Alvarez-Merino
{"title":"Supply Management by Remanufacturing Company of Mining Equipment","authors":"Marlith Roman-Rios, Mitshel Serratti-Ramos, Fernando Maradiegue-Tuesta, J. Alvarez-Merino","doi":"10.1109/IEEM44572.2019.8978866","DOIUrl":null,"url":null,"abstract":"The proposed supply management model is based, firstly, on realizing a Kraljic matrix to obtain a purchasing strategy, and then followed by the homologation of suppliers who are mainly willing to work with an inventory managed by suppliers (VMI) system. The process aims to reduce the delay time in the acquisition of R1600 loader parts so as to meet the customer in 52 days, the frame established by the company under study in reference to the average of 45 days as the sector standard for the same item.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978866","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The proposed supply management model is based, firstly, on realizing a Kraljic matrix to obtain a purchasing strategy, and then followed by the homologation of suppliers who are mainly willing to work with an inventory managed by suppliers (VMI) system. The process aims to reduce the delay time in the acquisition of R1600 loader parts so as to meet the customer in 52 days, the frame established by the company under study in reference to the average of 45 days as the sector standard for the same item.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
矿山设备再制造企业的供应管理
提出的供应管理模型首先基于Kraljic矩阵实现采购策略,然后通过供应商库存管理(VMI)系统对主要愿意工作的供应商进行认证。该流程旨在减少R1600装载机零件采购的延迟时间,以参考同类产品平均45天的行业标准,在52天内满足客户的要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Locating Humanitarian Relief Effort Facility Using P-Center Method A Method of Fault Identification Considering High Fix Priority in Open Source Project Model-based Systems Engineering Process for Supporting Variant Selection in the Early Product Development Phase A Method of Parameter Estimation in Flexible Jump Diffusion Process Models for Open Source Maintenance Effort Management Kanban-CONWIP Hybrid Model for Improving Productivity of an Electrostatic Coating Process
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1