{"title":"Interpolation of Rainfall-River Orle Discharge for Developing 1.032 MW of Hydropower in Estako-West, Nigeria","authors":"Oyati Edith Nwabuogo, O. Yahaya","doi":"10.2139/ssrn.3200955","DOIUrl":null,"url":null,"abstract":"Annual rainfall is of great importance to every nation and provides useful data on agricultural, hydrology and hydraulics designs. The research study presents the evaluation of the hydropower potential of river Orle using the analytical potential interpolation of hydrological elements (Rainfall, river discharges e.t.c) with emphasis of developing 1.032 MW power plant-reservoirs. Hydropower is a renewable energy source based on the natural water cycle and most mature, reliable and cost-effective renewable power generation technology. Gumbel’s Probability Distribution method, U.S Soil Conservation technique and empirical formulation were used to estimate maximum flood design, rainfall distribution and intensity and peak river flow. The hydrological data provided by Benin-Owena River Basin stationed in Auchi Polytechnic, Auchi and attached to Department of Civil Engineering Technology were applied for the analysis. The outputs revealed that annual average rainfall of 98.1 mm or more in 75-year; 130.1 mm or more in 50-year out of 100 years. The exceedence probability for a rainfall of 158.1mm is 0.25 with observed rainfall greater than normal. At discharge (10.77 * 10-2 m3/s), the proposed Orle hydropower scheme generated 1.032MW during the peak of wet and 76.6 KW was evaluated during the drying season at (0.80 * 10-2m3/s). The study draws a conclusion that for runoff river scheme at 41.7% flow, the total hydropower potential of 0.676 MW was evaluated.","PeriodicalId":237665,"journal":{"name":"Hydropower eJournal","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydropower eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3200955","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Annual rainfall is of great importance to every nation and provides useful data on agricultural, hydrology and hydraulics designs. The research study presents the evaluation of the hydropower potential of river Orle using the analytical potential interpolation of hydrological elements (Rainfall, river discharges e.t.c) with emphasis of developing 1.032 MW power plant-reservoirs. Hydropower is a renewable energy source based on the natural water cycle and most mature, reliable and cost-effective renewable power generation technology. Gumbel’s Probability Distribution method, U.S Soil Conservation technique and empirical formulation were used to estimate maximum flood design, rainfall distribution and intensity and peak river flow. The hydrological data provided by Benin-Owena River Basin stationed in Auchi Polytechnic, Auchi and attached to Department of Civil Engineering Technology were applied for the analysis. The outputs revealed that annual average rainfall of 98.1 mm or more in 75-year; 130.1 mm or more in 50-year out of 100 years. The exceedence probability for a rainfall of 158.1mm is 0.25 with observed rainfall greater than normal. At discharge (10.77 * 10-2 m3/s), the proposed Orle hydropower scheme generated 1.032MW during the peak of wet and 76.6 KW was evaluated during the drying season at (0.80 * 10-2m3/s). The study draws a conclusion that for runoff river scheme at 41.7% flow, the total hydropower potential of 0.676 MW was evaluated.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼日利亚Estako-West开发1.032 MW水电的降雨-河流奥尔勒流量插值
年降雨量对每个国家都非常重要,它为农业、水文和水力设计提供了有用的数据。本研究以开发1.032 MW电站水库为重点,采用降雨、河流量等水文要素的解析势插值法对奥尔勒河水电潜力进行了评价。水电是一种基于自然水循环的可再生能源,也是最成熟、可靠、性价比最高的可再生发电技术。采用Gumbel概率分布法、美国土壤保持技术和经验公式估算最大洪水设计、降雨分布和强度以及洪峰流量。本研究采用了奥奇理工学院Benin-Owena河流域的水文数据,该流域隶属于奥奇土木工程技术系。75年的年平均降雨量为98.1毫米或以上;在100年中有50年的降水超过130.1毫米。雨量为158.1毫米,超过正常值的概率为0.25。在流量(10.77 * 10-2m3/s)时,Orle水电方案丰水期发电量1.032MW,枯水期发电量(0.80 * 10-2m3/s)为76.6 KW。研究结果表明,在41.7%流量的径流河方案下,评价的总水电潜力为0.676 MW。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Link between Innovation in the Circular Economy Design and Efficiency Improvement in the Renewable Energy Technologies Hydrodynamics of an Earthquake Swarm Interpolation of Rainfall-River Orle Discharge for Developing 1.032 MW of Hydropower in Estako-West, Nigeria Hydro World: Things Starts Happening When You Start Believing Design and Construction of an Installation for Testing Bubble Generators Used for Water Aeration
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1