Bernhard Wally, J. Vyskočil, Petr Novák, C. Huemer, R. Šindelář, Petr Kadera, Alexandra Mazak, M. Wimmer
{"title":"Production Planning with IEC 62264 and PDDL","authors":"Bernhard Wally, J. Vyskočil, Petr Novák, C. Huemer, R. Šindelář, Petr Kadera, Alexandra Mazak, M. Wimmer","doi":"10.1109/INDIN41052.2019.8972050","DOIUrl":null,"url":null,"abstract":"Smart production systems need to be able to adapt to changing environments and market needs. They have to reflect changes in (i) the reconfiguration of the production systems themselves, (ii) the processes they perform or (iii) the products they produce. Manual intervention for system adaptation is costly and potentially error-prone. In this article, we propose a model-driven approach for the automatic generation and regeneration of production plans that can be triggered anytime a change in any of the three aforementioned parameters occurs.","PeriodicalId":260220,"journal":{"name":"2019 IEEE 17th International Conference on Industrial Informatics (INDIN)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 17th International Conference on Industrial Informatics (INDIN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INDIN41052.2019.8972050","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11
Abstract
Smart production systems need to be able to adapt to changing environments and market needs. They have to reflect changes in (i) the reconfiguration of the production systems themselves, (ii) the processes they perform or (iii) the products they produce. Manual intervention for system adaptation is costly and potentially error-prone. In this article, we propose a model-driven approach for the automatic generation and regeneration of production plans that can be triggered anytime a change in any of the three aforementioned parameters occurs.