Project Uncertainty, Management Practice and Project Performance: An Empirical Analysis on Customized Information Systems Development Projects

Q.Z. Wang, J. Liu
{"title":"Project Uncertainty, Management Practice and Project Performance: An Empirical Analysis on Customized Information Systems Development Projects","authors":"Q.Z. Wang, J. Liu","doi":"10.1109/IEMC.2006.4279882","DOIUrl":null,"url":null,"abstract":"This paper develops a risk-based integrated model of information systems development(ISD) project performance to explain the effect of project inherent uncertainty and management practices on project performance. Based on the dataset collected from customized information systems development projects of software houses in Hangzhou City of China,this paper carries out an empirical analysis on the research model. The results reveal that performance risk in development stage and performance risk in implementation stage are two intervening variables, which mediated the effects of project inherent uncertainty and management practices on both process and product performance. The findings suggest that management factors such as project planning and control,internal integration,user participation and top management support can improve project performance in the presence of project inherent uncertainty. In addition, the key influencing factors are found to be different in different project stages.Key influencing factors are project planning and control, internal integration and user participation in development stage. Key influencing factors are user participation and top management support in implementation stage.However,we have not found evidence for significant positive influence of process performance on product performance,which means that projects which come in within time and cost budgets may deliver poor systems.","PeriodicalId":153115,"journal":{"name":"2006 IEEE International Engineering Management Conference","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Engineering Management Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.2006.4279882","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

This paper develops a risk-based integrated model of information systems development(ISD) project performance to explain the effect of project inherent uncertainty and management practices on project performance. Based on the dataset collected from customized information systems development projects of software houses in Hangzhou City of China,this paper carries out an empirical analysis on the research model. The results reveal that performance risk in development stage and performance risk in implementation stage are two intervening variables, which mediated the effects of project inherent uncertainty and management practices on both process and product performance. The findings suggest that management factors such as project planning and control,internal integration,user participation and top management support can improve project performance in the presence of project inherent uncertainty. In addition, the key influencing factors are found to be different in different project stages.Key influencing factors are project planning and control, internal integration and user participation in development stage. Key influencing factors are user participation and top management support in implementation stage.However,we have not found evidence for significant positive influence of process performance on product performance,which means that projects which come in within time and cost budgets may deliver poor systems.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
项目不确定性、管理实践与项目绩效:基于定制化信息系统开发项目的实证分析
本文建立了一个基于风险的信息系统开发(ISD)项目绩效综合模型来解释项目内在不确定性和管理实践对项目绩效的影响。本文基于杭州市软件企业定制化信息系统开发项目数据集,对研究模型进行实证分析。结果表明,开发阶段绩效风险和实施阶段绩效风险是两个中介变量,中介了项目内在不确定性和管理实践对过程和产品绩效的影响。研究结果表明,在存在项目固有不确定性的情况下,项目计划和控制、内部整合、用户参与和高层管理支持等管理因素可以改善项目绩效。此外,在不同的项目阶段,关键的影响因素是不同的。关键的影响因素是项目规划和控制、内部集成和开发阶段的用户参与。关键的影响因素是用户参与和高层管理在实施阶段的支持。然而,我们没有发现过程性能对产品性能有显著的积极影响的证据,这意味着在时间和成本预算范围内进入的项目可能交付较差的系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Knowledge Acquisition and Innovation Performance by MNC Subsidiaries in China from the Perspective of Social Capital Empirical Study of Elements and Interrelation about the Current Situation of Continuous Improvement Leverage Sport Management and Coaching to Win High Tech Global Game A Conceptual Model on High-Performance Leadership and Organization Performance Issues of Fostering Innovational Engineers in a Technology Oriented Enterprise Keisuke
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1