The impact of supply lead-time on the value of Vendor Managed Inventory in an auto-correlated demand environment

Zainab Belalia, F. Ghaiti
{"title":"The impact of supply lead-time on the value of Vendor Managed Inventory in an auto-correlated demand environment","authors":"Zainab Belalia, F. Ghaiti","doi":"10.1109/LOGISTIQUA.2017.7962872","DOIUrl":null,"url":null,"abstract":"The value of Vendor Managed Inventory has been widely analyzed in the literature, for different supply chain characteristics, in particular, for various demand patterns, and by different modeling approaches. In this paper, we are interested in customer demand following an AR(1) process. We investigate the impact of lead-time variation on the value of the Vendor Managed Inventory in a two-echelon supply chain, where performance is measured in terms of inventory reductions. A correlation analysis is lead to evaluate the magnitude of the interaction between the manufacturer lead-time and benefits from Vendor Managed Inventory. Managerial guidelines are deduced, and opportunities for future research are proposed.","PeriodicalId":310750,"journal":{"name":"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Colloquium on Logistics and Supply Chain Management (LOGISTIQUA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LOGISTIQUA.2017.7962872","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The value of Vendor Managed Inventory has been widely analyzed in the literature, for different supply chain characteristics, in particular, for various demand patterns, and by different modeling approaches. In this paper, we are interested in customer demand following an AR(1) process. We investigate the impact of lead-time variation on the value of the Vendor Managed Inventory in a two-echelon supply chain, where performance is measured in terms of inventory reductions. A correlation analysis is lead to evaluate the magnitude of the interaction between the manufacturer lead-time and benefits from Vendor Managed Inventory. Managerial guidelines are deduced, and opportunities for future research are proposed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在自动关联需求环境下,供应前置时间对供应商管理库存价值的影响
针对不同的供应链特征,特别是不同的需求模式,通过不同的建模方法,文献中对供应商管理库存的价值进行了广泛的分析。在本文中,我们对遵循AR(1)过程的客户需求感兴趣。我们研究了交货时间变化对供应商管理库存价值的影响,在两级供应链中,绩效是根据库存减少来衡量的。通过相关性分析来评估制造商交货期与供应商管理库存收益之间的相互作用程度。推导了管理准则,并提出了未来研究的机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Towards a simulation model of an outpatient chemotherapy unit Supply chain management and organizational change: Integrating an activity after its subcontracting in a Moroccan construction company Workload balancing in nurse scheduling problem models and discussion Spatial analysis of bus accidents in France Toward an agent-based framework for human resource management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1