Governing Flat-Roof Constructions: A Case Study

Atle Engebø, E. Andenæs, T. Kvande, Jardar Lohne
{"title":"Governing Flat-Roof Constructions: A Case Study","authors":"Atle Engebø, E. Andenæs, T. Kvande, Jardar Lohne","doi":"10.24928/2018/0314","DOIUrl":null,"url":null,"abstract":"A lean construction process depends on reliable procuring and governing of materials. This paper examines the case of flat roof constructions. It is based on an assumption that current practice might lead to a risk of premature roof failures. Within the case of flat roof constructions, we seek to answer the following research questions:  What are the main threats to the value for the client in the case of flat-roof constructions?  How does the client govern in order to oversee that requirements are met regarding construction materialsand assembling? The research was explorative in nature and limited to the Norwegian context; based on a scoping literature study and seven semi-structured in-depth interviews with experienced industry actors. The findings show that in a short-term perspective, the divergence of stakeholder interest and premature roof failures present a great threat to the value of the building. Poor procuring and handling threatens the construction process. It is a source of disputes between the contractor and the client. Furthermore, it constitutes an obstacle in creating long-term value for the client. Flat-roof constructions are particularly exposed. We propose that clients should implement a more structured approach to overseeing that client requirements are met. To ensure a lean project delivery and maximizing value, mitigating unwanted events related to suppliers and materials are crucial.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0314","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

A lean construction process depends on reliable procuring and governing of materials. This paper examines the case of flat roof constructions. It is based on an assumption that current practice might lead to a risk of premature roof failures. Within the case of flat roof constructions, we seek to answer the following research questions:  What are the main threats to the value for the client in the case of flat-roof constructions?  How does the client govern in order to oversee that requirements are met regarding construction materialsand assembling? The research was explorative in nature and limited to the Norwegian context; based on a scoping literature study and seven semi-structured in-depth interviews with experienced industry actors. The findings show that in a short-term perspective, the divergence of stakeholder interest and premature roof failures present a great threat to the value of the building. Poor procuring and handling threatens the construction process. It is a source of disputes between the contractor and the client. Furthermore, it constitutes an obstacle in creating long-term value for the client. Flat-roof constructions are particularly exposed. We propose that clients should implement a more structured approach to overseeing that client requirements are met. To ensure a lean project delivery and maximizing value, mitigating unwanted events related to suppliers and materials are crucial.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
管理平顶建筑:个案研究
精益施工过程依赖于可靠的材料采购和管理。本文考察了平屋顶结构的情况。它是基于一个假设,即目前的做法可能会导致过早的顶板失效的风险。在平屋顶建筑的情况下,我们试图回答以下研究问题:·在平屋顶建筑的情况下,对客户价值的主要威胁是什么?客户如何管理以监督满足建筑材料和装配方面的要求?这项研究是探索性的,仅限于挪威的情况;基于一项范围界定文献研究和七次对经验丰富的行业参与者的半结构化深度访谈。研究结果表明,从短期来看,利益相关者的利益分歧和过早的屋顶破坏对建筑物的价值构成了很大的威胁。采购和处理不当威胁到施工过程。这是承包商和客户之间纠纷的根源。此外,它还构成了为客户创造长期价值的障碍。平顶建筑尤其暴露在外。我们建议客户应该实施一种更加结构化的方法来监督客户需求是否得到满足。为了确保精益项目的交付和价值最大化,减少与供应商和材料相关的不必要事件是至关重要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects Complex Production Systems: Non-Linear and Non-Repetitive Projects Towards Facility Management Participation in Design: A UCSF Case Study Project Delivery Through Lean Principles Across All Disciplnes of Construction in a Developing Country Environment Short Takt Time in Construction – a Practical Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1