ANALISIS NILAI HASIL TERHADAP PENGENDALIAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG MAPOLRES DEMAK LANJUTAN (STUDI KASUS : PEMBANGUNAN GEDUNG MAPOLRES DEMAK LANJUTAN)

Shanty Andriani Novita, Agung Sutarto
{"title":"ANALISIS NILAI HASIL TERHADAP PENGENDALIAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG MAPOLRES DEMAK LANJUTAN (STUDI KASUS : PEMBANGUNAN GEDUNG MAPOLRES DEMAK LANJUTAN)","authors":"Shanty Andriani Novita, Agung Sutarto","doi":"10.53866/jimi.v2i3.122","DOIUrl":null,"url":null,"abstract":"Looking at the total level of rapid development of construction work, which is relatively fast, it becomes a challenge for the construction world. This is followed by the development of a very diverse method of various construction implementations applied in the process. In every construction project implementation, the main factor that makes the project successful or not is in terms of both time and cost. This research uses quantitative descriptive analysis research. In this descriptive analysis, which was carried out at the Mapolres Mapolres Advanced Building Project, the aim was to determine the time performance and find solutions to problems that existed in the implementation of this project. On the schedule variance graph (SV), the implementation of this project is all positive. Shows that this positive value is that the implementation of the work has accelerated or has not experienced delays, and the performance of the project implementation is better and faster following the initial planning. The value of the schedule performance index (SPI) on the overall implementation of this project from the 8th week to the 11th week shows a value of more than one (>1), so the project is completed faster than what has been planned.","PeriodicalId":414894,"journal":{"name":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53866/jimi.v2i3.122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Looking at the total level of rapid development of construction work, which is relatively fast, it becomes a challenge for the construction world. This is followed by the development of a very diverse method of various construction implementations applied in the process. In every construction project implementation, the main factor that makes the project successful or not is in terms of both time and cost. This research uses quantitative descriptive analysis research. In this descriptive analysis, which was carried out at the Mapolres Mapolres Advanced Building Project, the aim was to determine the time performance and find solutions to problems that existed in the implementation of this project. On the schedule variance graph (SV), the implementation of this project is all positive. Shows that this positive value is that the implementation of the work has accelerated or has not experienced delays, and the performance of the project implementation is better and faster following the initial planning. The value of the schedule performance index (SPI) on the overall implementation of this project from the 8th week to the 11th week shows a value of more than one (>1), so the project is completed faster than what has been planned.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
高级马德拉斯需求建设项目的时间管理价值分析(案例研究:高级马德拉斯需求建设)
纵观建筑工作发展的总水平,这是比较快的,这成为对建筑界的一个挑战。接下来是开发过程中应用的各种构造实现的非常多样化的方法。在每一个建设项目实施中,决定项目成功与否的主要因素是时间和成本两个方面。本研究采用定量描述性分析方法进行研究。在这个描述性分析中,这是在Mapolres Mapolres高级建筑项目中进行的,目的是确定时间绩效,并找到解决项目实施中存在的问题的办法。在进度方差图(SV)上,本项目的实施情况都是积极的。说明这一正价值是工作的实施加速或没有经历延迟,项目实施的绩效按照最初的规划更好更快。从第8周到第11周,本项目整体实施进度绩效指数(SPI)值大于1(>1),项目完成速度比计划快。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH ELECTRONIC WORD OF MOUTH (E-WOM) TERHADAP LOYALITAS KONSUMEN DENGAN KEPUTUSAN PEMBELIAN SEBAGAI VARIABEL MEDIASI (Studi Kasus Pada Konsumen Wanita Monokrom Store Yogyakarta) ANALISA OPTIMASI WAKTU DAN BIAYA DENGAN MENGGUNAKAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN PENANGANAN ROB ERETAN KABUPATEN INDRAMAYU JAWA BARAT HAK MEWARIS ANAK ANGKAT DI INDONESIA DITINJAU DARI HUKUM PERDATA DAN HUKUM ISLAM FENOMENA POLITIK IDENTITAS DALAM PEMILU DI INDONESIA ANALISIS STRUKTUR KOLOM PADA GEDUNG PARKIR RUMAH SAKIT DI SEMARANG
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1