Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage

Alexander Budzier, B. Flyvbjerg, A. Garavaglia, Andreas Leed
{"title":"Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage","authors":"Alexander Budzier, B. Flyvbjerg, A. Garavaglia, Andreas Leed","doi":"10.2139/ssrn.3303410","DOIUrl":null,"url":null,"abstract":"This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Based on a reference class of 216 past, comparable projects, risk of cost overrun was found to be 202% or less, with 80% certainty, i.e., 20% risk of an overrun above 202%. Based on a reference class of 200 past, comparable projects, risk of schedule overrun was found to be 104% or less, with 80% certainty, i.e., 20% risk of overrun above 104%. Cost risk and schedule risk are both substantial for nuclear waste storage projects.","PeriodicalId":365212,"journal":{"name":"Environment & Natural Resources eJournal","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environment & Natural Resources eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3303410","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Based on a reference class of 216 past, comparable projects, risk of cost overrun was found to be 202% or less, with 80% certainty, i.e., 20% risk of an overrun above 202%. Based on a reference class of 200 past, comparable projects, risk of schedule overrun was found to be 104% or less, with 80% certainty, i.e., 20% risk of overrun above 104%. Cost risk and schedule risk are both substantial for nuclear waste storage projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
核废料贮存定量成本与进度风险分析
本研究对核废料储存项目的成本和进度风险提供了一个独立的、由外而内的评估。根据过去216个可比较项目的参考分类,发现成本超支的风险为202%或更低,有80%的确定性,即超支超过202%的风险为20%。基于过去200个可比较项目的参考类,发现进度超支的风险为104%或更少,具有80%的确定性,即,超过104%的超支风险为20%。成本风险和进度风险都是核废料贮存项目的主要风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Power Quality Improvement of Multifunctional Grid Connected Inverter With Renewable System Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage How Do We Get Along? International Economic Law And The Nation-State Blockchain and the Extractive Industries #2: Diamonds Case Study Product Design and the Choice of Green Degree
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1