Computer capacity trends and order-delivery lags, 1961--1967

M. Ballot, K. Knight
{"title":"Computer capacity trends and order-delivery lags, 1961--1967","authors":"M. Ballot, K. Knight","doi":"10.1145/1468075.1468142","DOIUrl":null,"url":null,"abstract":"This paper examines the growth of computational facilities in the U.S. from the end of 1961 to September of 1967, exploring the dynamics of the growth process and attempting to link it to specific market events. The dynamics of supply and demand for general purpose computational capability points to many problems for both producer and user. This paper considers one of these pertinent to the ordering policy and planning of the firm seeking to acquire EDP equipment for, say, systems conversion; the delivery lag, or average time between equipment orders and delivery. This lag is studied and estimated using two separate empirical models.","PeriodicalId":180876,"journal":{"name":"Proceedings of the April 30--May 2, 1968, spring joint computer conference","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1899-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the April 30--May 2, 1968, spring joint computer conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1468075.1468142","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper examines the growth of computational facilities in the U.S. from the end of 1961 to September of 1967, exploring the dynamics of the growth process and attempting to link it to specific market events. The dynamics of supply and demand for general purpose computational capability points to many problems for both producer and user. This paper considers one of these pertinent to the ordering policy and planning of the firm seeking to acquire EDP equipment for, say, systems conversion; the delivery lag, or average time between equipment orders and delivery. This lag is studied and estimated using two separate empirical models.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计算机容量趋势和订单交付滞后,1961- 1967
本文考察了1961年底至1967年9月美国计算设备的增长,探索了增长过程的动态,并试图将其与特定的市场事件联系起来。通用计算能力的供求动态对生产者和使用者都提出了许多问题。本文考虑了其中一个与寻求获得电子数据处理设备的公司的订购政策和计划有关,例如,系统转换;交货滞后,或设备订单和交货之间的平均时间。这种滞后是用两个独立的经验模型来研究和估计的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Martin Orlando reporting environment Interpretation of organic chemical formulas by computer Some ways of providing communication facilities for time-shared computing Automation in the design of asynchronous sequential circuits Computer input of forms
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1