Analysis of Delay In Execution of Construction Projects

P. Muralidhar, R. Jain, B. Srivasta, V. Rao
{"title":"Analysis of Delay In Execution of Construction Projects","authors":"P. Muralidhar, R. Jain, B. Srivasta, V. Rao","doi":"10.33736/jcest.880.2018","DOIUrl":null,"url":null,"abstract":"The construction industry is one of the major sectors that provide important ingredients for the development of country’s economy. A survey is conducted to identify the major causes of construction delays, its effects, and minimizing delays in construction projects using relative importance index method. The questionnaire was circulated among various construction companies located in India to find the reasons which are affecting the construction projects in India. The various factors are identified for this purpose and these critical factors are then categorized into owner, contractor, consultant, material, design, labor, equipment and external factors. About fifty six responses are received for the analysis purpose. SPSS software is applied to perform the analysis. The survey is concentrated on the frequency of occurrence of this factors and what is the severity of this factors in the five point scale.","PeriodicalId":346729,"journal":{"name":"Journal of Civil Engineering, Science and Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering, Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33736/jcest.880.2018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The construction industry is one of the major sectors that provide important ingredients for the development of country’s economy. A survey is conducted to identify the major causes of construction delays, its effects, and minimizing delays in construction projects using relative importance index method. The questionnaire was circulated among various construction companies located in India to find the reasons which are affecting the construction projects in India. The various factors are identified for this purpose and these critical factors are then categorized into owner, contractor, consultant, material, design, labor, equipment and external factors. About fifty six responses are received for the analysis purpose. SPSS software is applied to perform the analysis. The survey is concentrated on the frequency of occurrence of this factors and what is the severity of this factors in the five point scale.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建设项目执行延迟分析
建筑业是国家经济发展的重要组成部分之一。运用相对重要性指数法,对施工延误的主要原因及其影响进行了调查,并最大限度地减少了施工项目的延误。调查问卷在印度各建筑公司之间分发,以找出影响印度建筑项目的原因。为此目的确定了各种因素,然后将这些关键因素分类为业主,承包商,顾问,材料,设计,劳动力,设备和外部因素。为了分析目的,我们收到了大约56份回复。应用SPSS软件进行分析。调查的重点是这些因素发生的频率,以及这些因素在五分制中的严重程度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
RETRACTION NOTE TO: ASSESSING SEISMIC SOIL LIQUEFACTION POTENTIAL USING MACHINE LEARNING APPROACH EFFECT OF ADDITION OF CaO ON COMPRESSIVE STRENGTH OF HIGH-VOLUME FLY ASH CONCRETE EDITORIAL SCOPE – WASTE MANAGEMENT AND RECYCLING MATLAB PROGRAM FOR RATING SOILS BASED ON ENGINEERING BEHAVIOURS NONLINEAR LATERAL RESPONSE OF PILE GROUP IN CLAY USING THE MODIFIED CAM CLAY SOIL MODEL
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1