Analisis Sistem House Load Dalam Menunjang Kehandalan Penyaluran Listrik di PLTDG Pesanggaran

I. W. Yasa, G. Nur, Made Asna
{"title":"Analisis Sistem House Load Dalam Menunjang Kehandalan Penyaluran Listrik di PLTDG Pesanggaran","authors":"I. W. Yasa, G. Nur, Made Asna","doi":"10.38043/telsinas.v4i2.3335","DOIUrl":null,"url":null,"abstract":"The rapid and continuous growth of electricity today makes the availability of electricity must continue to increase as well. However, sometimes an imbalance between the capacity of the generating unit and the load on the power grid system can cause a decrease/increase in the frequency of the generating unit system, including the generation side, which under certain conditions can cause the generating unit to die. If the generating units are shutdown at the same time/simultaneously it can result in a blackout on the system. The house load operation mode on the power generation unit is one of the scenarios that can be applied to speed up the recovery process during a blackout. In this study, a house load test was carried out on one of the generating units. The methodology used is to conduct direct testing on the PLTDG Block 4 Unit 11 Pesanggaran. The results of this test the unit has successfully carried out a house load test with a time of 30 minutes from the 150 kV network voltage loss unit so that the house load operation mode on the PLTDG Block 4 Unit 11 Pesanggaran generator unit can accelerate the efficiency of synchronization back to the network between 73.26% to 88.31% produces an efficiency of 15.05%. Besides being able to increase the reliability of the distribution of the electric power system, the application of the house load operation mode on the generating unit can provide potential economic benefits of Rp. 1,690,804,988.,","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/telsinas.v4i2.3335","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The rapid and continuous growth of electricity today makes the availability of electricity must continue to increase as well. However, sometimes an imbalance between the capacity of the generating unit and the load on the power grid system can cause a decrease/increase in the frequency of the generating unit system, including the generation side, which under certain conditions can cause the generating unit to die. If the generating units are shutdown at the same time/simultaneously it can result in a blackout on the system. The house load operation mode on the power generation unit is one of the scenarios that can be applied to speed up the recovery process during a blackout. In this study, a house load test was carried out on one of the generating units. The methodology used is to conduct direct testing on the PLTDG Block 4 Unit 11 Pesanggaran. The results of this test the unit has successfully carried out a house load test with a time of 30 minutes from the 150 kV network voltage loss unit so that the house load operation mode on the PLTDG Block 4 Unit 11 Pesanggaran generator unit can accelerate the efficiency of synchronization back to the network between 73.26% to 88.31% produces an efficiency of 15.05%. Besides being able to increase the reliability of the distribution of the electric power system, the application of the house load operation mode on the generating unit can provide potential economic benefits of Rp. 1,690,804,988.,
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
对House系统的分析支持PLTDG电力的可靠性
今天电力的快速和持续增长使得电力的可用性也必须继续增加。然而,有时发电机组的容量与电网系统负荷之间的不平衡会导致发电机组系统(包括发电侧)的频率降低/增加,在一定条件下会导致发电机组死亡。如果发电机组同时关闭,可能会导致系统停电。发电机组的负荷运行模式是在停电时加快恢复进程的一种方案。在本研究中,对其中一台发电机组进行了室内负荷试验。使用的方法是对PLTDG 4区块11单元Pesanggaran进行直接测试。本次试验的结果:机组成功地从150kv网损机组进行了30分钟的户载试验,在PLTDG Block 4机组11机组上采用户载运行方式,可将同步回网效率从73.26%加速到88.31%,效率为15.05%。除了能够提高电力系统配电的可靠性外,在发电机组上应用户负荷运行模式可提供1,690,804,988卢比的潜在经济效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Dinding Bata Bertulang Terhadap Kinerja Struktur Rangka Dengan Dinding Pengisi (Infilled Frame) Analisa Karakteristik Kecelakaan dan Faktor Penyebab Kecelakaan Akibat Jalan di Provinsi Jambi Analisis Perbaikan Faktor Daya Pada Tranformator 2500KVA/400V di Bandar Udara I Gusti Ngurah Rai Bali Revitalisasi Desain Struktural Gedung Universitas Darul Ulum Melalui Analisis Perbandingan Tulangan Balok T Kajian Fluktuasi Muka Air Tanah dan Kualitas Air Tanah Dangkal Berbasis Sistem Informasi Geografis (SIG) di Kecamatan Denpasar Utara Kota Denpasar
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1