Lighting and illumination committee

G. Stickney
{"title":"Lighting and illumination committee","authors":"G. Stickney","doi":"10.1109/JoAIEE.1922.6593220","DOIUrl":null,"url":null,"abstract":"The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.","PeriodicalId":268640,"journal":{"name":"Journal of the American Institute of Electrical Engineers","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1922-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the American Institute of Electrical Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JoAIEE.1922.6593220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
照明及照明委员会
委员会在此分两节提交其报告- -第一节,委员会的活动,第二节,该领域的进展。委员会的活动委员会大约是在10月中旬任命的。11月初举行了一次“通信会议”,会上就主席认为重要的问题征求了委员会的意见。随后在协会总部举行了一次会议。此时,终于商定了这一年的计划,并作出了执行计划的安排。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Board of directors' report The electric strength of air under continuous potentials and as influenced by temperature Personal mention Engineering societies library Engineering societies library
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1