{"title":"Lighting and illumination committee","authors":"G. Stickney","doi":"10.1109/JoAIEE.1922.6593220","DOIUrl":null,"url":null,"abstract":"The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.","PeriodicalId":268640,"journal":{"name":"Journal of the American Institute of Electrical Engineers","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1922-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the American Institute of Electrical Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JoAIEE.1922.6593220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The Committee herewith submits its report in two sections — first, activities of the Committee, and second, progress in the art. Activities of the Committee The Committee was appointed about the middle of October. Early in November, a “correspondence meeting” was held, by which the views of the Committee were obtained on subjects which appeared important to the Chairman. This was followed by a meeting at the Association's headquarters. At this time, the plans for the year were finally agreed upon and arrangements made for carrying them out.