Prosedur Production Control Pada Pt Astra Honda Motor Jakarta

Maya Sofiana
{"title":"Prosedur Production Control Pada Pt Astra Honda Motor Jakarta","authors":"Maya Sofiana","doi":"10.31334/abiwara.v1i1.497","DOIUrl":null,"url":null,"abstract":"This writing aims to know how to procedures of production control on PT Astra Honda Motor (PT AHM) on Jakarta. This writing is executed on PT AHM, with the methods of literature writing, observation, and interviews. The results of this writing is represent that, procedures of production control is still not suitable because it is still in development stage, so less than the maximum in the application of production planning, production control, and production actual. The procedures of production control on PT AHM Jakarta of production planning, production control, and production actual. The constraints faced is the procedures of production control on PT AHM Jakarta is difficult to implement prosedures for changing the order of planning on the day running, SFG lacks parts, there are parties who disagree about the minus burden. The solutions in facing is the procedures of production control on PT AHM Jakarta is in the case of production planning, in case of force, a change in order is permitted provided all parts are available, in the case of control production , in case of important.  In the case control production, SFG is allowed as long as it can be completed that day.  In the case actual production, disputing parties are accommodated, meetings with related parties.","PeriodicalId":117744,"journal":{"name":"Abiwara : Jurnal Vokasi Administrasi Bisnis","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-08-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Abiwara : Jurnal Vokasi Administrasi Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31334/abiwara.v1i1.497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This writing aims to know how to procedures of production control on PT Astra Honda Motor (PT AHM) on Jakarta. This writing is executed on PT AHM, with the methods of literature writing, observation, and interviews. The results of this writing is represent that, procedures of production control is still not suitable because it is still in development stage, so less than the maximum in the application of production planning, production control, and production actual. The procedures of production control on PT AHM Jakarta of production planning, production control, and production actual. The constraints faced is the procedures of production control on PT AHM Jakarta is difficult to implement prosedures for changing the order of planning on the day running, SFG lacks parts, there are parties who disagree about the minus burden. The solutions in facing is the procedures of production control on PT AHM Jakarta is in the case of production planning, in case of force, a change in order is permitted provided all parts are available, in the case of control production , in case of important.  In the case control production, SFG is allowed as long as it can be completed that day.  In the case actual production, disputing parties are accommodated, meetings with related parties.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
这篇文章的目的是了解如何在雅加达的PT阿斯特拉本田汽车(PT AHM)生产控制程序。本文采用PT AHM方法,采用文献写作法、观察法和访谈法。本文的研究结果表明,由于生产控制程序仍处于开发阶段,因此在生产计划、生产控制和生产实际中的应用还没有达到最大。PT AHM雅加达生产计划、生产控制、生产实际的生产控制程序。所面临的限制是PT AHM雅加达的生产控制程序难以实施更改当天运行计划顺序的程序,SFG缺乏零件,有各方对负负担持不同意见。面对的解决方案是PT AHM雅加达的生产控制程序,在生产计划的情况下,在强制情况下,只要所有部件都可用,就允许更改顺序,在控制生产的情况下,在重要的情况下。在案例控制生产中,只要当天能完成,SFG是允许的。在实际生产的情况下,可以容纳争议当事人,与有关当事人会面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Tata kelola Kolaborasi dan UU Cipta kerja Terhadap Perkembangan UMKM Disaat Pandemi Covid 19 Manajemen Komunikasi Digital Perencanaan, Aktivitas dan Evaluasi Asosiasi Konten Kreator Indonesia dalam Meningkatkan Omset Bisnis UMKM Implementation of CSR Activities from Stakeholder Theory Perspective in Wika Mengajar Kebijakan Ekonomi: Perspektif Ekonomi Politik Dalam Pembangunan di Indonesia Analisis Pengelolaan Pendidikan Tinggi Swasta Di Indonesia Sebagai Entitas Corporat Non Profit Dan Upayanya Dalam Mempertahankan Eksistensi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1