B. Henderson-Sellers, R. Dué, I. Graham, G. Collins
{"title":"Third generation OO processes: a critique of RUP and OPEN from a project management perspective","authors":"B. Henderson-Sellers, R. Dué, I. Graham, G. Collins","doi":"10.1109/APSEC.2000.896730","DOIUrl":null,"url":null,"abstract":"Second generation OO methods, with a few exceptions, contained no elements addressing process or project management. Third generation methods have been defined as those collaborative developments which also have a significant process element. Two examples are the rational unified process (RUP) and object-oriented process, environment and notation (OPEN). We examine RUP and OPEN from a project management viewpoint and evaluate whether either or both would meet acceptable standards in process support, project management guidelines and full lifecycle description for OO software development.","PeriodicalId":404621,"journal":{"name":"Proceedings Seventh Asia-Pacific Software Engeering Conference. APSEC 2000","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Seventh Asia-Pacific Software Engeering Conference. APSEC 2000","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2000.896730","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23
Abstract
Second generation OO methods, with a few exceptions, contained no elements addressing process or project management. Third generation methods have been defined as those collaborative developments which also have a significant process element. Two examples are the rational unified process (RUP) and object-oriented process, environment and notation (OPEN). We examine RUP and OPEN from a project management viewpoint and evaluate whether either or both would meet acceptable standards in process support, project management guidelines and full lifecycle description for OO software development.