Barriers for implementing dispute review board (DRB) method to Sri Lankan construction industry

T.N. Liyanawatta, M. Abeynayake, P.M.S.U. Sumanarathna
{"title":"Barriers for implementing dispute review board (DRB) method to Sri Lankan construction industry","authors":"T.N. Liyanawatta, M. Abeynayake, P.M.S.U. Sumanarathna","doi":"10.31705/wcs.2023.22","DOIUrl":null,"url":null,"abstract":"In Sri Lanka, dispute resolution methods in construction contracts are Negotiation, Mediation, Adjudication, and Arbitration. Although the Dispute Review Board (DRB) method has been successfully used internationally for more than 30 years, it has rarely been applied in domestic contractual disputes. Thus, this research was conducted to identify the barriers hindering the implementation of the Dispute Resolution Board (DRB) mechanism in the Sri Lankan construction industry and to provide recommendations to overcome these barriers. This research was deemed necessary because the current dispute resolution methods could not effectively resolve contractual conflicts. Despite introducing DRB through Dispute Adjudication Boards (DAB), its potential benefits have not been fully realised in Sri Lanka. To achieve the purpose of the study, a comprehensive literature review was conducted first, and then a preliminary survey to identify the barriers to the implementation of DRB in the Sri Lankan construction industry. Subsequently, a questionnaire was administered to 44 professionals engaged in client and contracting organisations. The research findings revealed that the main barriers to the implementation of the DRB mechanism are unawareness of the concept of DRB, clients considering DRB as a burden and hassle for them, additional costs to be incurred, and lack of experience. Accordingly, the study recommends increasing the awareness of the DRB at the national level with the support of authorities to utilise it as a valuable alternative for resolving disputes in the Sri Lankan construction industry.","PeriodicalId":221447,"journal":{"name":"11th World Construction Symposium - 2023","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th World Construction Symposium - 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/wcs.2023.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Sri Lanka, dispute resolution methods in construction contracts are Negotiation, Mediation, Adjudication, and Arbitration. Although the Dispute Review Board (DRB) method has been successfully used internationally for more than 30 years, it has rarely been applied in domestic contractual disputes. Thus, this research was conducted to identify the barriers hindering the implementation of the Dispute Resolution Board (DRB) mechanism in the Sri Lankan construction industry and to provide recommendations to overcome these barriers. This research was deemed necessary because the current dispute resolution methods could not effectively resolve contractual conflicts. Despite introducing DRB through Dispute Adjudication Boards (DAB), its potential benefits have not been fully realised in Sri Lanka. To achieve the purpose of the study, a comprehensive literature review was conducted first, and then a preliminary survey to identify the barriers to the implementation of DRB in the Sri Lankan construction industry. Subsequently, a questionnaire was administered to 44 professionals engaged in client and contracting organisations. The research findings revealed that the main barriers to the implementation of the DRB mechanism are unawareness of the concept of DRB, clients considering DRB as a burden and hassle for them, additional costs to be incurred, and lack of experience. Accordingly, the study recommends increasing the awareness of the DRB at the national level with the support of authorities to utilise it as a valuable alternative for resolving disputes in the Sri Lankan construction industry.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
斯里兰卡建筑业实施争议审查委员会(DRB)方法的障碍
在斯里兰卡,建筑合同纠纷的解决方法有谈判、调解、裁决和仲裁。尽管争端审查委员会(DRB)方法在国际上已成功使用了30多年,但很少在国内合同纠纷中应用。因此,本研究旨在确定阻碍斯里兰卡建筑行业实施争端解决委员会(DRB)机制的障碍,并提供克服这些障碍的建议。由于现行的纠纷解决方法不能有效地解决合同冲突,本研究被认为是必要的。尽管通过争端裁决委员会(DAB)引入了DRB,但其潜在的好处尚未在斯里兰卡得到充分实现。为了达到研究的目的,首先进行了全面的文献综述,然后进行了初步调查,以确定斯里兰卡建筑业实施DRB的障碍。随后,对44名从事客户和承包机构的专业人士进行了问卷调查。研究结果表明,实施DRB机制的主要障碍是对DRB概念的不了解,客户认为DRB对他们来说是一种负担和麻烦,产生的额外成本以及缺乏经验。因此,该研究建议在当局的支持下,提高国家一级对DRB的认识,将其作为解决斯里兰卡建筑业纠纷的有价值的替代方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
0.40
自引率
0.00%
发文量
0
期刊最新文献
Economic models of climate change: systematic review of benefits, limitations, and future directions Adaptation of blockchain and smart contracts to the construction industry of developing countries A Taxonomy of waterproofing systems for high-rise building projects in the tropics Potential use of digital twin for construction progress monitoring Adoptability of bioplastic as a sustainable material in Sri Lankan building construction industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1