{"title":"Bidding zones reconfiguration — Current issues literature review, criterions and social welfare","authors":"Július Bemš, T. Králík, J. Knápek, Anna Kradeckaia","doi":"10.1109/IGBSG.2016.7539427","DOIUrl":null,"url":null,"abstract":"The aim of this paper is to introduce methods of solution regarding current issues of electricity markets integration in Europe. The focus is pointed on bidding zones overview and bidding zones reconfiguration process in general, meantime the situation in central Europe will be analysed more deeply. Bidding zone can be defined as an area without internal business congestion. It means that transaction can be completed between any two points inside this area and electricity can be transferred without requirement of transmission capacity allocation. Bidding zones borders in many countries are the same as the political borders because countries were more isolated in the past than in present time. This situation is changing with the increase of international cooperation. Countries like Czech Republic, Slovakia, Poland, Hungary and France are examples of bidding zones that are identical with political borders. On the other hand, there is a single bidding zone that includes Germany, Austria and Luxembourg (DE-AT-LU). The most scrutinous issue of bidding zones configuration covers DE-AT-LU zone where the problems with internal congestion occur and correspondingly affect surrounding bidding zones, especially Czech Republic and Poland. Transmission capacities inside this zone are insufficient. Electricity flows through neighbouring grids and constrains transmission capacities for local market participants. This article presents criteria that might be used for bidding zones reconfiguration with the main accent on social welfare concept applicability. Social welfare is a wide term which is investigated in this paper under bidding zones reconfiguration problem.","PeriodicalId":348843,"journal":{"name":"2016 2nd International Conference on Intelligent Green Building and Smart Grid (IGBSG)","volume":"65 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 2nd International Conference on Intelligent Green Building and Smart Grid (IGBSG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IGBSG.2016.7539427","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

The aim of this paper is to introduce methods of solution regarding current issues of electricity markets integration in Europe. The focus is pointed on bidding zones overview and bidding zones reconfiguration process in general, meantime the situation in central Europe will be analysed more deeply. Bidding zone can be defined as an area without internal business congestion. It means that transaction can be completed between any two points inside this area and electricity can be transferred without requirement of transmission capacity allocation. Bidding zones borders in many countries are the same as the political borders because countries were more isolated in the past than in present time. This situation is changing with the increase of international cooperation. Countries like Czech Republic, Slovakia, Poland, Hungary and France are examples of bidding zones that are identical with political borders. On the other hand, there is a single bidding zone that includes Germany, Austria and Luxembourg (DE-AT-LU). The most scrutinous issue of bidding zones configuration covers DE-AT-LU zone where the problems with internal congestion occur and correspondingly affect surrounding bidding zones, especially Czech Republic and Poland. Transmission capacities inside this zone are insufficient. Electricity flows through neighbouring grids and constrains transmission capacities for local market participants. This article presents criteria that might be used for bidding zones reconfiguration with the main accent on social welfare concept applicability. Social welfare is a wide term which is investigated in this paper under bidding zones reconfiguration problem.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
招标区划重构——现状文献综述、规范与社会福利
本文的目的是介绍解决目前欧洲电力市场一体化问题的方法。重点介绍招标区概况和招标区重组的总体过程,同时对中欧地区的情况进行深入分析。竞价区可以定义为内部业务不拥挤的区域。即在该区域内任意两点之间均可完成交易,且无需分配输电容量即可进行电力输送。许多国家的投标区边界与政治边界相同,因为过去的国家比现在更加孤立。随着国际合作的加强,这种情况正在发生变化。捷克共和国、斯洛伐克、波兰、匈牙利和法国等国家都是与政治边界相同的竞标区。另一方面,有一个单一的招标区,包括德国,奥地利和卢森堡(DE-AT-LU)。投标区配置最严格的问题是DE-AT-LU区域,该区域出现内部拥堵问题,并相应影响周边投标区,特别是捷克和波兰。该区域内的传输能力不足。电力流经邻近的电网,限制了当地市场参与者的输电能力。本文提出了可用于招标区划重构的标准,主要强调社会福利概念的适用性。社会福利是一个广义的概念,本文研究的是招标区划重构问题下的社会福利问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Planning of household renewable generation for improved energy utilization in microgrids Analysis of a new resonant converter with auxiliary windings to extend input voltage range Filter-based dual-voltage architecture for low-power long-word TCAM design Implementation of a modular full-bridge DC/DC converter Fabrication of flexible electrochromic devices based on tungsten trioxide nanobundles
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1