A study of resource constraint project scheduling problem for energy saving

T. Miyamoto, K. Mori, S. Kitamura, Y. Izui
{"title":"A study of resource constraint project scheduling problem for energy saving","authors":"T. Miyamoto, K. Mori, S. Kitamura, Y. Izui","doi":"10.1109/ICSSE.2014.6887897","DOIUrl":null,"url":null,"abstract":"In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/πRC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.","PeriodicalId":166215,"journal":{"name":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSE.2014.6887897","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/πRC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
面向节能的资源约束项目调度问题研究
在能源消耗方面,制造业周围的环境已经变得相当严格。作为一个包含制造业生产调度问题的框架,资源约束型项目调度问题(RCPSP)得到了大量的研究。我们提出了RCPSP/πRC公式,该公式可以处理实际的能源约束,如高峰时段的电力限制、合同需求和安装过程中的能源消耗。本文通过计算实验对RCPSP/πRC进行了计算。并与两种启发式规则进行了比较。计算实验结果表明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Maximum power point tracking of wind energy systems for wide range operation Nash-optimization enhanced distributed model predictive control for VAV air conditioning system A research on the construction process of integrated indicator system based on vector space model Monocular vision-based range estimation of on-road vehicles Application of fire monitoring and personnel evacuation in subway station based on Wireless Sensor Network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1