Pelatihan Perencanaan Optimalisasi Sistem Lahan Pertanian Masyarakat Desa Kramat Kabupaten Lamongan

Rio Rahma Dhana, Armanda Lutfi Febrianto
{"title":"Pelatihan Perencanaan Optimalisasi Sistem Lahan Pertanian Masyarakat Desa Kramat Kabupaten Lamongan","authors":"Rio Rahma Dhana, Armanda Lutfi Febrianto","doi":"10.29303/rengganis.v1i2.90","DOIUrl":null,"url":null,"abstract":"Reservoir is a container or place for storing raw water, which will later be used as a temporary water storage area, then used as a place for water treatment for the continued growth of rice plants. In addition to rice plants, reservoirs are also used to minimize drought disasters in the dry season. The construction of this reservoir will be used by the Kramat village community to improve the economy in two sectors, namely agriculture and village potential, Kramat village itself is one of the villages in Lamongan Regency which has an area of ​​194.80 hectares and is located in Lamongan sub-district which has a population of 2,012 people. Most of their livelihoods are farmers. Seeing such conditions, farmers need facilities to help meet the needs of raw water for their agricultural land which will be planned with the planning method carried out by the construction of the reservoir with various stages such as measuring with 2 methods, either surveying in the field or utilizing digital applications or software using fields area or Google earth, after finding the size, then we can determine the sketch of the image on the reservoir by drawing in AutoCAD software. The area of ​​land used for the construction of the reservoir has an area of ​​1,452.03 m2, which is later estimated to be able to accommodate 8,507,190 L of water. The total volume of excavation work is 8,507.19 m3 with an estimated work period of 23 days. Excavator pc 200 heavy equipment operational cost : Rp. 101.200.000 per 23 days and for Dump truck capacity of 8 m3: Rp. 2,400,000 (2 dump trucks) per day.","PeriodicalId":299666,"journal":{"name":"Rengganis Jurnal Pengabdian Masyarakat","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rengganis Jurnal Pengabdian Masyarakat","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29303/rengganis.v1i2.90","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Reservoir is a container or place for storing raw water, which will later be used as a temporary water storage area, then used as a place for water treatment for the continued growth of rice plants. In addition to rice plants, reservoirs are also used to minimize drought disasters in the dry season. The construction of this reservoir will be used by the Kramat village community to improve the economy in two sectors, namely agriculture and village potential, Kramat village itself is one of the villages in Lamongan Regency which has an area of ​​194.80 hectares and is located in Lamongan sub-district which has a population of 2,012 people. Most of their livelihoods are farmers. Seeing such conditions, farmers need facilities to help meet the needs of raw water for their agricultural land which will be planned with the planning method carried out by the construction of the reservoir with various stages such as measuring with 2 methods, either surveying in the field or utilizing digital applications or software using fields area or Google earth, after finding the size, then we can determine the sketch of the image on the reservoir by drawing in AutoCAD software. The area of ​​land used for the construction of the reservoir has an area of ​​1,452.03 m2, which is later estimated to be able to accommodate 8,507,190 L of water. The total volume of excavation work is 8,507.19 m3 with an estimated work period of 23 days. Excavator pc 200 heavy equipment operational cost : Rp. 101.200.000 per 23 days and for Dump truck capacity of 8 m3: Rp. 2,400,000 (2 dump trucks) per day.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
克拉马特农村农地系统优化规划培训
水库是储存原水的容器或场所,以后用作临时储水区,然后用作水稻植株继续生长的水处理场所。除了种植水稻,水库也被用来减少旱季的干旱灾害。克拉马特村社区将利用该水库的建设来改善农业和村庄潜力这两个部门的经济。克拉马特村本身是拉蒙干县的一个村庄,面积为194.80公顷,位于拉蒙干街道,人口为2,012人。他们的主要生计是务农。看到这种情况,需要设施来帮助农民满足原水的农业用地的需要将计划与规划方法进行了储层等不同阶段的建设与2方法测量,测量在现场或利用数字应用程序或软件使用字段区域或谷歌地球,发现大小后,然后我们可以确定图像的草图在水库在AutoCAD绘图软件。水库建设用地面积为1452.03平方米,经测算可容水量为8507.190升。挖掘总工程量8,507.19立方米,预计工期23天。挖掘机pc 200重型设备运营成本:每23天101.20万卢比,8立方米自卸卡车运营成本:每天240万卢比(2辆自卸卡车)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Peningkatan Karakter Siswa Melalui Pementasan Drama di SDN 4 Mataram Oleh Kampus Mengajar Angkatan 6 Optimalisasi Keterampilan Literasi Siswa SMP NW Mataram Melalui Program Klinik Literasi Penerapan Adaptasi Teknologi bagi Guru SD Negeri 4 Labuan Tereng untuk Menunjang Proses Pembelajaran Gerakan Menanam Mangrove Bersama SMPN 3 Mataram Di Sungai Mujang Ampenan Tengah Sosialisasi Pembuatan Rekening Online melalui BSI Mobile dalam Meningkatkan Kemampuan Melakukan Transaksi Online Mahasiswa Baru UIN Mataram
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1