Metode Pengendalian Jadwal Pembangunan Pelabuhan dengan Kombinasi Barchart dan Network Planning Studi Kasus Proyek PT. DOK Warisan Pertama

Usmanul Hayadi Umar, Nur Dzuraida
{"title":"Metode Pengendalian Jadwal Pembangunan Pelabuhan dengan Kombinasi Barchart dan Network Planning Studi Kasus Proyek PT. DOK Warisan Pertama","authors":"Usmanul Hayadi Umar, Nur Dzuraida","doi":"10.37253/jcep.v3i1.1239","DOIUrl":null,"url":null,"abstract":"A construction company engaged in the construction of ports and docks, namely PT. DOK Warisan Pertama in Batam is running a port project in Batam City. The number of work items carried out in a project requires a good project management to run it. This study aims to review the port project scheduling currently being implemented by PT. DOK Warisan Pertama with the Critical Path Method (CPM) method. The results of the research carried out indicated that the project was completed within 39 weeks. There are several critical paths in the CPM planning for this project. This indicates that the job does not have a free float to complete the job. Making a CPM in this project can be used as a reference and evaluation in carrying out project work.","PeriodicalId":102190,"journal":{"name":"Journal of Civil Engineering and Planning","volume":"1 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37253/jcep.v3i1.1239","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A construction company engaged in the construction of ports and docks, namely PT. DOK Warisan Pertama in Batam is running a port project in Batam City. The number of work items carried out in a project requires a good project management to run it. This study aims to review the port project scheduling currently being implemented by PT. DOK Warisan Pertama with the Critical Path Method (CPM) method. The results of the research carried out indicated that the project was completed within 39 weeks. There are several critical paths in the CPM planning for this project. This indicates that the job does not have a free float to complete the job. Making a CPM in this project can be used as a reference and evaluation in carrying out project work.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种控制码头建设时间表的方法,结合Barchart和网络计划研究PT. DOK project first project
巴淡岛从事港口和码头建设的建筑公司PT. DOK Warisan Pertama正在巴淡市运营一个港口项目。在项目中执行的工作项的数量需要良好的项目管理来运行它。本研究旨在回顾PT. DOK Warisan Pertama目前使用关键路径方法(Critical Path Method, CPM)实施的港口项目调度。所进行的研究结果表明,该项目在39周内完成。在这个项目的CPM计划中有几个关键的路径。这表明作业没有自由浮动来完成作业。在本项目中制定CPM可作为开展项目工作的参考和评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Pavement Condition Index Functional Evaluation of Runway Pavement Used Pavement Condition Index (PCI) Method (Case Study : Fatmawati Soekarno Airport Provinsi Bengkulu) The The Structure Analysis of Five Floor Mall Building in Semarang City According to SNI 1726-2019 and SNI 2847-2019 Analysis of the Effect of Shear Walls on Building Structural Deviations in High-rise Buildings Monde City Tower M2 Batam City Analysis of Pillar Foundations and Abutments in The Batu Rasang-Mambulu Village Bridge Project Tambelengan District Sampang Regency Delineation and Evaluation of Land Use and Spatial Patterns on the Flood Plains in the City of Sungai Lilin
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1