PERENCANAAN AREA HIJAU DI PINGGIRAN SALURAN INDUK PERUMAHAN

Y. A. Sabtalistia, Ione Susanto, Vanessa Raharja
{"title":"PERENCANAAN AREA HIJAU DI PINGGIRAN SALURAN INDUK PERUMAHAN","authors":"Y. A. Sabtalistia, Ione Susanto, Vanessa Raharja","doi":"10.24912/jbmi.v5i1.18428","DOIUrl":null,"url":null,"abstract":"Banten Indah Permai Housing, Unyur, Serang, Banten is one of the housing estates in the city of Serang. Thehousing has a main canal that is quite large with a fairly heavy flow of water. However, unfortunately on theoutskirts of the main canal overgrown with weeds and shrubs that are not maintained. In addition, there is noretaining wall in the main canal. Based on these problems, this PKM aims to design planning drawings whichinclude site plan drawings, sections, and 3D perspectives. The implementation method is carried out in 3 stages for6 months. The first stage is to conduct a field survey (site measurement) and coordinate with partners (BIP housingdeveloper) and several Housing residents regarding green area design concepts and ideas. The second stage is tosubmit designs in the form of working drawings and 3D perspectives to partners. In the second stage, partnersprovide input or ideas for design improvements proposed by the PKM team. The third stage is the submission of theresults of the green area design by the PKM team to partners. The construction of park benches, children's playareas, sports areas, jogging tracks, rocky paths for reflection, retaining walls, park benches, and parks on theoutskirts of the main canal is expected to provide a place for residents to socialize and create fun activities forresidents. in the morning or evening.ABSTRAK\nPerumahan Banten Indah Permai, Unyur, Serang, Banten merupakan salah satu perumahan yang ada di kota Serang.Perumahan tersebut mempunyai saluran induk yang cukup besar dengan aliran air cukup deras. Namun, sayangnyadi pinggiran saluran induk tersebut ditumbuhi tanaman liar dan semak belukar yang tidak terawat. Selain itu tidakada dinding penahan tanah pada saluran induk tersebut. Berdasarkan permasalahan tersebut maka PKM ini bertujuanuntuk membuat desain gambar perencanaan yang meliputi gambar site plan, potongan, dan perspektif 3D. Metodepelaksanaan dilakukan dalam 3 tahap selama 6 bulan. Tahap pertama adalah melakukan survei lapangan(pengukuran lokasi tapak) dan berkoordinasi dengan mitra (pengembang perumahan BIP) dan beberapa wargaPerumahan mengenai konsep dan ide desain area hijau. Tahap kedua adalah melakukan pengajuan desain berupagambar kerja dan perspektif 3D kepada mitra. Dalam tahap kedua, mitra memberikan masukan atau ide untukperbaikan desain yang diajukan tim PKM. Tahap ketiga adalah penyerahan hasil desain area hijau oleh tim PKMkepada mitra. Pembuatan bangku-bangku taman, area bermain anak, area olahraga, jogging track, jalan berbatuuntuk refleksi, dinding penahan tanah, bangku-bangku taman, dan taman di pinggiran saluran induk diharapkanmampu memberikan wadah sebagai tempat bersosialisasi warga dan menciptakan kegiatan menyenangkan bagiwarga pada saat pagi atau sore hari.","PeriodicalId":127539,"journal":{"name":"Jurnal Bakti Masyarakat Indonesia","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Bakti Masyarakat Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24912/jbmi.v5i1.18428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Banten Indah Permai Housing, Unyur, Serang, Banten is one of the housing estates in the city of Serang. Thehousing has a main canal that is quite large with a fairly heavy flow of water. However, unfortunately on theoutskirts of the main canal overgrown with weeds and shrubs that are not maintained. In addition, there is noretaining wall in the main canal. Based on these problems, this PKM aims to design planning drawings whichinclude site plan drawings, sections, and 3D perspectives. The implementation method is carried out in 3 stages for6 months. The first stage is to conduct a field survey (site measurement) and coordinate with partners (BIP housingdeveloper) and several Housing residents regarding green area design concepts and ideas. The second stage is tosubmit designs in the form of working drawings and 3D perspectives to partners. In the second stage, partnersprovide input or ideas for design improvements proposed by the PKM team. The third stage is the submission of theresults of the green area design by the PKM team to partners. The construction of park benches, children's playareas, sports areas, jogging tracks, rocky paths for reflection, retaining walls, park benches, and parks on theoutskirts of the main canal is expected to provide a place for residents to socialize and create fun activities forresidents. in the morning or evening.ABSTRAK Perumahan Banten Indah Permai, Unyur, Serang, Banten merupakan salah satu perumahan yang ada di kota Serang.Perumahan tersebut mempunyai saluran induk yang cukup besar dengan aliran air cukup deras. Namun, sayangnyadi pinggiran saluran induk tersebut ditumbuhi tanaman liar dan semak belukar yang tidak terawat. Selain itu tidakada dinding penahan tanah pada saluran induk tersebut. Berdasarkan permasalahan tersebut maka PKM ini bertujuanuntuk membuat desain gambar perencanaan yang meliputi gambar site plan, potongan, dan perspektif 3D. Metodepelaksanaan dilakukan dalam 3 tahap selama 6 bulan. Tahap pertama adalah melakukan survei lapangan(pengukuran lokasi tapak) dan berkoordinasi dengan mitra (pengembang perumahan BIP) dan beberapa wargaPerumahan mengenai konsep dan ide desain area hijau. Tahap kedua adalah melakukan pengajuan desain berupagambar kerja dan perspektif 3D kepada mitra. Dalam tahap kedua, mitra memberikan masukan atau ide untukperbaikan desain yang diajukan tim PKM. Tahap ketiga adalah penyerahan hasil desain area hijau oleh tim PKMkepada mitra. Pembuatan bangku-bangku taman, area bermain anak, area olahraga, jogging track, jalan berbatuuntuk refleksi, dinding penahan tanah, bangku-bangku taman, dan taman di pinggiran saluran induk diharapkanmampu memberikan wadah sebagai tempat bersosialisasi warga dan menciptakan kegiatan menyenangkan bagiwarga pada saat pagi atau sore hari.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
规划在总居民区郊区的绿色区域
万丹Indah Permai Housing, Unyur, Serang,万丹是Serang市的一个住宅区。住宅有一条主渠,相当大,水流相当大。然而,不幸的是,主运河的外围长满了杂草和灌木,没有得到维护。此外,主渠没有挡土墙。基于这些问题,本PKM旨在设计规划图纸,包括场地平面图、剖面图和三维透视图。实施方法分3个阶段进行,为期6个月。第一阶段是进行实地调查(现场测量),并与合作伙伴(BIP住房开发商)和一些住房居民就绿地设计概念和想法进行协调。第二阶段是向合作伙伴提交工作图纸和3D透视图形式的设计。在第二阶段,合作伙伴为PKM团队提出的设计改进提供输入或想法。第三阶段是PKM团队向合作伙伴提交绿地设计成果。公园长椅、儿童游乐区、运动区、慢跑跑道、岩石反射路径、挡土墙、公园长椅和主运河郊区的公园的建设有望为居民提供一个社交和创造有趣活动的场所。在早上或晚上。ABSTRAKPerumahan万丹Indah Permai Unyur,撒万丹merupakan salah研究perumahan杨ada迪哥打撒钱。Perumahan tersebut mempunyaya saluran duk - yang cucuup的意思是“空中cucuup”。Namun, sayangnyadi pinggiran saluran induk tersei,但ditumbuhi tanaman骗子,但semak belukar yang tidak terawi。Selain itu tidakada dinding penahan tanah pada saluran induk tersebut。Berdasarkan permasalahan tersebut maka PKM ini bertujuanuntuk成员设计了gambar perencanan yang meliputi gambar站点平面图,poongan, dan perspective 3D。Metodepelaksanaan dilakukan dalam 3 tahap selama 6 bulan。Tahap pertama adalah melakukan survei lapangan(企鹅)dan berkoordinasi dengan mitra (pengembang perumahan BIP) dan beberapa wargman mengenai konsep danide desain area hijau。这是我的梦想,我的梦想,我的梦想,我的梦想。Dalam tahap kedua, mitra成员masukan atau和untukperbaikan desain yang diajukan tim PKM。Tahap ketiga adalah penyerahan hasil desain area hijau oleh tim pkkkepada mitra。Pembuatan bangku-bangku taman, area bermain anak, area olahraga,慢跑跑道,jalan berbatununtuk refleksi, dinding penahan tanah, bangku-bangku taman, dan taman di pinggiran saluran dirk diharapkanmampu成员wadah sebagai tempat bersialalisasi warga dan menciptakan kegiatan menyenangkan bagiwarga paada saat pagi atau hari。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PRODUCT DAN PROCESS DESIGN FOR YOUR BUSINESS PENGAPLIKASIAN SENI MELALUI MURAL EDUKASI SEBAGAI SUMBER PENGETAHUAN TERHADAP MASYARAKAT DI KELURAHAN KUTAWARU KABUPATEN CILACAP SURVEI PENGUKURAN STATUS GIZI BALITA DAN POLA PEMBERIAN MAKANAN PENDAMPING ASI DI RPTRA MANDALA KELURAHAN TOMANG JAKARTA BARAT PERSYARATAN DALAM PENENTUAN HAK ASUH PELATIHAN ANALISIS HASIL UJI KENYAMANAN PENGGUNA KAKI PALSU DENGAN MENGGUNAKAN METODE SIX MINUTE WALK TEST METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1