{"title":"Protection challenges facing Distributed Generation on rural feeders","authors":"A. Foss, Kalle E. Leppik","doi":"10.1109/EPEC.2010.5697226","DOIUrl":null,"url":null,"abstract":"Experience with connecting farm biogas generation to rural distribution feeders in Ontario has revealed several challenges with electrical protection. The biogas projects are small (<500kW), synchronous, farm-based, and looking for an affordable protection solution involving the use of only low-voltage equipments. The utility feeders are generally at the 8.3kV and 12.5kV voltage levels, can involve long lengths and contain significant imbalance due to the presence of single-phase laterals. The main challenges arise from two requirements.","PeriodicalId":393869,"journal":{"name":"2010 IEEE Electrical Power & Energy Conference","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Electrical Power & Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2010.5697226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Experience with connecting farm biogas generation to rural distribution feeders in Ontario has revealed several challenges with electrical protection. The biogas projects are small (<500kW), synchronous, farm-based, and looking for an affordable protection solution involving the use of only low-voltage equipments. The utility feeders are generally at the 8.3kV and 12.5kV voltage levels, can involve long lengths and contain significant imbalance due to the presence of single-phase laterals. The main challenges arise from two requirements.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
农村馈线分布式发电面临的保护挑战
在安大略省,将农场沼气发电与农村配电馈线连接的经验揭示了电气保护方面的一些挑战。沼气项目规模小(<500kW),同步,以农场为基础,寻找一种经济实惠的保护解决方案,只使用低压设备。公用事业馈线通常在8.3kV和12.5kV电压水平,可能涉及较长的长度,并且由于单相分支的存在而存在明显的不平衡。主要的挑战来自两个要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Static security assessment using radial basis function neural networks based on growing and pruning method Fuzzy unit commitment using the Ant Colony Search Algorithm Transient states simulation in power plant auxiliary electrical system A centralized controller to control power demands of electric water heaters for peek shaving of total house-hold power demands Wind power forecasting based on econometrics theory
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1